OSHA Inspection: ELMIRA STRUCTURES, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ELMIRA STRUCTURES, INC. in TEXAS ROADHOUSE PROJECT 719 SUITE 25, SOUTH MEADOW STREET, ITHACA, NY 14853 (NAICS 238190). OSHA activity number 341288454.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ELMIRA STRUCTURES, INC.
- Site address
- TEXAS ROADHOUSE PROJECT 719 SUITE 25, SOUTH MEADOW STREET
- City
- ITHACA
- State
- NY
- ZIP
- 14853
- Mailing
- 66 PHILO ROAD, ELMIRA, NY 14903
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238190
- Employees
- 10
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.451 F07
- Issued
- Jun 10, 2016
- Abate by
- Jul 15, 2016
- Penalty
- Initial $3,080 · Current $2,310 Reduced
General-duty citation text
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration: a) At the south side of the worksite, on or about 2/18/16: A competent person did not ensure that employees working on a 20 foot, Werner aluminum scaffold stage did so within its posted load rating. b) At the south side of the worksite, on or about 2/18/16: A competent person did not ensure that employees working on 2 tubular welded framed scaffold, worked from platforms that were fully planked. Abatement documentation must be submitted for this item.
Recent events (2)
- — I (S) $2310
- — Z (S) $3080
1926.451 A01
- Issued
- Jun 10, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(a)(1): Scaffold(s) and scaffold(s) component(s) were not capable of supporting, without failure, its own weight and at least four times the maximum intended load applied or transmitted to it: a) At the south side of the worksite, on or about 2/18/16: The Foreman did not ensure that the 20 foot, Werner aluminum scaffold stage workers were on, was capable of supporting at least 3 people and an excess of 500 pounds.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 B01
- Issued
- Jun 10, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a) At the south side of the worksite, on or about 2/18/16: The Foreman did not ensure that employees working on a 2 tubular welded framed scaffolds had working platforms that were fully planked.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at Elmira Structures, INC.
View Elmira Structures, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238190)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341288454.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.