OSHA Inspection: PASADENA REFINING SYSTEMS, INC.

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of PASADENA REFINING SYSTEMS, INC. in 111 RED BLUFF ROAD, PASADENA, TX 77506 (NAICS 324110). OSHA activity number 341309680.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Pasadena Refining Systems, INC. — free Get an email when a new federal OSHA severe-injury report for Pasadena Refining Systems, INC. is published. One employer, no account, unsubscribe in one click.
Site address
111 RED BLUFF ROAD
City
PASADENA
State
TX
ZIP
77506
Mailing
111 RED BLUFF ROAD, PASADENA, TX 77506
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
324110
Employees
600
Ownership type
A

5 citations on file for this inspection.

1910.119 E01

Serious Gravity 10 1 instance 20 exposed
Issued
Aug 25, 2016
Abate by
Sep 29, 2016
Penalty
Initial $12,471 · Current $12,471
29 CFR 1910.119(j)(6)(ii): Appropriate checks and inspections were not performed to assure that equipment installed was consistent with design specifications and the manufacturer's instructions.                                                          In The Alternative  OSH ACT of 1970 Section (5)(a)(1): OSH ACT of 1970 Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees:   On or around March 7, 2016 and at times prior thereto at the Pasadena Refining System, Inc. facility in Pasadena, Texas, the employer did not identify, evaluate, and control the hazards involved in operating the Hydrogen and Light Cycle Gas Oil piping (10"-P-0112-Cs) circuit in high-temperature service for an extended length of time without establishing a corrosion rate and monitoring for depletion of wall thickness.  AVD- At the Pasadena Refining System, Inc. facility, the employer replaced sections of a pipe segment with new metallurgy and left a section of old piping in place that was forgotten and not reflected in the process safety information and mechanical integrity program.
Recent events (2)
  • — I (S) $12471
  • — Z (S) $12471

1910.119 J04 II

Deleted Serious Gravity 10 4 instances 20 exposed
Issued
Aug 25, 2016
Abate by
Sep 29, 2016
Penalty
Initial $12,471 · Current $0 Reduced
29 CFR 1910.119(j)(4)(ii): Inspection and testing procedures did not follow recognized and generally accepted good engineering practices.                                                        In The Alternative  OSH ACT of 1970 Section (5)(a)(1): OSH ACT of 1970 Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees:  On or about March 5, 2016 and at times prior thereto, in the 62 Diesel Hydrotreater Unit at the Pasadena Refining System, Inc. refinery in Pasadena, Texas,  the employer did not follow recognized and generally accepted good engineering practice (RAGAGEP) for Inspection and testing of the piping. Examples of such RAGAGEP include but are not limited to API RP 570 (Piping Inspection Code: In-Service Inspection, Rating, Repair, and Alteration of Piping Systems), API RP 571 (Damage Mechanisms Affecting Fixed Equipment in the Refining Industry), API RP 574 (Inspection Practices for Piping System Components) and API RP 939-C (Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries)   For piping circuit 10"-P-0112-Cs the employer failed to:      a) Identify a piping circuit in which sulfidation can occur in the mechanical integrity inspection plan.     b) Evaluate the piping system based on present or possible damage mechanisms.     c) Establish a corrosion rate for the piping circuit.     d) Calculate and track wall loss caused by sulfidation corrosion.
Recent events (2)
  • — I (S) $0
  • — Z (S) $12471

1910.119 J04 III

Deleted Serious Gravity 10 2 instances 20 exposed
Issued
Aug 25, 2016
Abate by
Sep 29, 2016
Penalty
Initial $0 · Current $0
29 CFR 1910.119(j)(4)(iii): The frequency of inspections and tests of process equipment to maintain its mechanical integrity, was not consistent with applicable manufacturer's recommendations and good engineering practices, or more frequently determined to be necessary by prior operating experience.                                                             In The Alternative  OSH ACT of 1970 Section (5)(a)(1): OSH ACT of 1970 Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees        On March 5, 2016 and at times prior thereto at the Pasadena Refining System, Inc. facility in Pasadena, Texas the employer did not inspect process piping circuit 10"-P-0112-Cs at frequencies consistent with recognized good engineering practice such as but not limited to API RP 570 (Piping Inspection Code: In-Service Inspection, Rating, Repair, and Alteration of Piping Systems) and API RP 571 (Damage Mechanisms Affecting Fixed Equipment in the Refining Industry) when:     a) The employer failed to calculate corrosion rates for the piping on either a short-term or LT corrosion basis. (API RP 570 section 7.1.3)     b) The period between thickness measurements exceeded five years. (API RP 570 Table 2)
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.119 J05

Deleted Serious Gravity 10 1 instance 20 exposed
Issued
Aug 25, 2016
Abate by
Sep 29, 2016
Penalty
Initial $12,471 · Current $0 Reduced
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits (defined by the process safety information in paragraph (d) of this section) before further use or in a safe and timely manner when necessary means were taken to assure safe operation:                                                       In The Alternative  OSH ACT of 1970 Section (5)(a)(1): OSH ACT of 1970 Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees:   On or around March 5, 2016 and at times prior thereto, in the 62 Diesel Hydrotreater Unit of the Pasadena Refining System, Inc. refinery in Pasadena, Texas the employer operated the piping circuit 10"-P-0112-Cs with wall thickness less than required for safe operation.
Recent events (2)
  • — I (S) $0
  • — Z (S) $12471

1910.119 D03 I B

Other-than-serious 3 instances 20 exposed
Issued
Aug 25, 2016
Abate by
Sep 29, 2016
Penalty
Initial $1,000 · Current $1,000
29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams were not accurate and did not represent equipment that was existing and was part of the process.  On or about March 7, 2016 at the Pasadena Refining System, Inc. facility in Pasadena, Texas, the employer Piping and Instrumentation "Drawings (PIDs) for the 62 Diesel Hydrotreater Unit Unit were not accurate in the representation of the process.     a) The employer's PID 62-11-F6202 does not accurately identify the material of construction for piping in the unit represented by line number 10"-P-0112-Cs that transmits process stream to the H-1 Pretreater Charge Vessel.     b) The employer's PID 62-11-F6202 shows line 4"-SM0124-Af connected to the 150# Steam supply header when the line has been dead-legged in the field and does not connect the process line 10"-P-0112-Cs to the steam supply.     c) The employer's PID 62-11-6222 does not accurately identify the material of construction for piping in the unit represented by line number 10"-P-0112-Cs that transmits process stream from E-1A heater to the H-1 Pretreater Charge Vessel.
Recent events (2)
  • — I (O) $1000
  • — Z (O) $1000

View Pasadena Refining Systems, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341309680.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.