OSHA Inspection: OLGUIN STUCCO, CORP.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of OLGUIN STUCCO, CORP. in 702 S. KENILWORTH AVE., OAK PARK, IL 60304 (NAICS 238140). OSHA activity number 341362432.

Watch Olguin Stucco, Corp. — free Get an email when a new federal OSHA severe-injury report for Olguin Stucco, Corp. is published. One employer, no account, unsubscribe in one click.
Site address
702 S. KENILWORTH AVE.
City
OAK PARK
State
IL
ZIP
60304
Mailing
4031 S. MAPLEWOOD AVE., CHICAGO, IL 60632
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
3
Ownership type
A

9 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $300.00 · Current $300.00
29 CFR 1903.19(c)(1):  The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:    Olguin Stucco, Corp., failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected:     Citation Number                       Item Number                            Abatement Date  01                                            01a                                            06/08/2016  01                                            01b                                            06/08/2016  01                                            02a                                            06/08/2016  01                                            02b                                           06/08/2016 01                                            03a                                            06/08/2016 01                                            03b                                            06/08/2016 01                                            04a                                            06/08/2016 01                                            04b                                            06/08/2016      In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (O) $300

1926.416 A01

Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $2800.00
29 CFR 1926.416(a)(1):  Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means:    a) On or about March 30, 2016, employees were exposed to electrical shock while working in close proximity to a 120/240 volt overhead power line.     In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $2800

1926.451 F06

Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6):    a) On or about March 30, 2016, employees were exposed to electrical hazards while erecting, dismantling, and working from frame scaffolding in close proximity to a 120/240 volt overhead power line.     In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

1926.451 E01

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $2800.00
29 CFR 1926.451(e)(1): Safe access was not provided to scaffold platforms when the platforms were more than 2 feet above or below the point of access:    a)  On or about March 30, 2016, employees were exposed to a fall hazard of approximately 16.7 feet while accessing a ladder jack scaffold.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $2800

1926.1053 B05 I

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.1053(b)(5)(i): Non-self-supporting ladders shall used at an angle such that the horizontal distance from the top support to the foot of the ladder is approximately one-quarter of the working length of the ladder (the distance along the ladder between the foot and the top support):     a)  On or about March 30, 2016, extension ladders being used were not setup at a 4:1 angle.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

1926.454 A

Serious Gravity 5 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $2000.00
29 CFR 1926.454(a):  The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:    a)  On or about March 30, 2016, employees were not trained to recognize and eliminate the hazards associated with working from scaffolding.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (S) $2000

1926.503 A01

Serious Gravity 5 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.503(a)(1):  The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards:   a)  On or about March 30, 2016, employees were exposed to fall hazards while performing stucco work and the employer did not provide a training program to recognize fall hazards and the procedures to be followed in order to minimize those hazards.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (S) $0

1926.451 G01 I

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $2800.00
29 CFR 1926.451(g)(1)(i): Each employee on a boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold was not protected by a personal fall arrest system:    a)  On March 30, 2016, employees working from a ladder jack scaffold were exposed to a fall hazard of approximately 17 feet.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $2800

1926.501 B13

Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.501(b)(13):  Each employee engaged in residential construction activities 6 feet or more above lower levels was not protected by guardrail systems, safety net systems, or personal fall arrest systems:    a)  On or about March 30, 2016, employees performing stucco work were exposed to fall hazards of approximately 22.6 feet.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

View OLGUIN STUCCO, CORP.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341362432.