YUKON, OK ·
OSHA Inspection: TOVAR'S PLASTERING
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of TOVAR'S PLASTERING in 1205 S. GARTH BROOKS BLVD., YUKON, OK 73099 (NAICS 238310). OSHA activity number 341400844.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- TOVAR'S PLASTERING
- Site address
- 1205 S. GARTH BROOKS BLVD.
- City
- YUKON
- State
- OK
- ZIP
- 73099
- Mailing
- 1616 SE 5TH ST., MOORE, OK 73160
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238310
- Employees
- 2
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.451 B01 I
- Issued
- Jul 8, 2016
- Abate by
- Jul 18, 2016
- Penalty
- Initial $1,600 · Current $1,600
General-duty citation text
29 CFR 1926.451(b)(1)(i): Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) was not installed so that the space between adjacent units and the space between the platform and the uprights were no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary. On or about April 14, 2016, south side of building, each scaffold plank was not installed so that the space between each adjacent plank and the space between the platform and the uprights was no more than 1 inch wide. Employees were exposed to hazards of a fall.
Recent events (1)
- · Z (S) $1600
1926.451 B08
- Issued
- Jul 8, 2016
- Abate by
- Jul 18, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(b)(8): At all points of a scaffold where the platform changes direction, such as turning a corner, any platform that rests on a bearer at an angle other than a right angle shall be laid first, and platforms which rest at right angles over the same bearer shall be laid second, on top of the first platform. On or about April 14, 2016, where platform changed direction on the south side of the building, the platform that rested on a bearer at an angle other than a right angle was not laid first. Employees were exposed to the hazard of falls.
Recent events (1)
- · Z (S) $0
1926.451 E02 I
- Issued
- Jul 8, 2016
- Abate by
- Jul 18, 2016
- Penalty
- Initial $1,600 · Current $1,600
General-duty citation text
29 CFR 1926.451(e)(2)(i): Portable, hook-on, and attachable ladders used for access were not positioned so as not to tip the scaffold. On or about April 14, 2016, portable ladder used to access scaffold platforms was not positioned so as not to tip the scaffold where it was resting against the cross bracing. Employees were exposed to the hazard of falls.
Recent events (1)
- · Z (S) $1600
1926.451 G01
- Issued
- Jul 8, 2016
- Abate by
- Jul 18, 2016
- Penalty
- Initial $1,600 · Current $1,600
General-duty citation text
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level. On or about April 14, 2016, south side of building, employees on a scaffold more than 10 feet above a lower level were not protected from falling to lower lever. Employees were exposed to the hazard of falls.
Recent events (1)
- · Z (S) $1600
1926.452 C02
- Issued
- Jul 8, 2016
- Abate by
- Jul 18, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.452(c)(2): Tubular welded frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would have secured vertical members together laterally: On or about April 14, 2016, tubular welded scaffold frames were not braced by cross, horizontal, or diagonal braces, or combination thereof, on both sides of frames. Employees were exposed to the hazard of falls.
Recent events (1)
- · Z (S) $0
More inspections at Tovar'S Plastering
View Tovar'S Plastering's full OSHA safety record →
More inspections in this industry (NAICS 238310)
More inspections in OK
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341400844.