OSHA Inspection: MORGAN ADVANCED CERAMICS, INC.

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of MORGAN ADVANCED CERAMICS, INC. in 7331 WILLIAM AVE, ALLENTOWN, PA 18106 (NAICS 325180). OSHA activity number 341402881.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Morgan Advanced Ceramics, INC. — free Get an email when a new federal OSHA severe-injury report for Morgan Advanced Ceramics, INC. is published. One employer, no account, unsubscribe in one click.
Site address
7331 WILLIAM AVE
City
ALLENTOWN
State
PA
ZIP
18106
Mailing
7331 WILLIAM AVE, ALLENTOWN, PA 18106
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
325180
Employees
43
Ownership type
A

5 citations on file for this inspection.

1910.147 C04 I

Serious Gravity 5 6 instances 37 exposed
Issued
May 25, 2016
Penalty
Initial $3,825 · Current $1,913 Reduced
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section:  a) CMP Reactors 1-6, North West end of shop - on or about April 21, 2016, the employer developed written energy control procedure CMP Reactors 1-6 for the loading, unloading and cleaning of the machines, however, management did not utilize the procedure for energy control activities performed.  b) GC5, South East end of shop - on or about April 21, 2016, the employer developed a written energy control procedure GC5 for maintenance of the machine, however, management did not utilize the procedure for energy control activities performed.  c) GC6, South East end of shop - on or about April 21, 2016, the employer developed a written energy control procedure GC6 for maintenance of the machine, however, management did not utilize the procedure for energy control activities performed.  d) GC7, South East end of shop - on or about April 21, 2016, the employer developed a written energy control procedure GC7 for maintenance of the machine, however, management did not utilize the procedure for energy control activities performed.  e) Mill Lane, South West end of shop - on or about April 21, 2016, the employer developed a written energy control procedure Mill Lane for maintenance of the machine, however, management did not utilize the procedure for energy control activities performed.  f) OPTO 2, North West end of shop - on or about April 21, 2016, the employer developed a written energy control procedure OPTO 2 for ion source work of the machine, however, management did not utilize the procedure for energy control activities performed.
Recent events (2)
  • — I (S) $1912.5
  • — Z (S) $3825

1910.147 C06 I C

Serious Gravity 5 1 instance 37 exposed
Issued
May 25, 2016
Abate by
Jun 14, 2016
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(6)(i)(C): Where lockout was used for energy control, the periodic inspection did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected.  a) Energy Control Program - on or about April 21, 2016, the employer performed periodic inspections for the energy control program which did not include a review between the inspector and each authorized employee.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.333 B02 I

Serious Gravity 5 1 instance 37 exposed
Issued
May 25, 2016
Abate by
Jun 14, 2016
Penalty
Initial $3,060 · Current $1,530 Reduced
29 CFR 1910.333(b)(2)(i): The employer did not make a written copy of the procedures outlined in paragraph (b)(2) of 29 CFR 1910.333 available for inspection by employees and by the Assistant Secretary of Labor and his or her authorized representatives:  a) 7331 William Ave. Allentown, PA - on or about April 21, 2016, the employer did not have a written copy of the procedures for lockout and tagging when working on or near exposed de-energized parts available.
Recent events (2)
  • — I (S) $1530
  • — Z (S) $3060

1910.333 B02 IV A

Deleted Serious Gravity 5 1 instance 37 exposed
Issued
May 25, 2016
Abate by
Jun 14, 2016
Penalty
Initial $0 · Current $0
29 CFR 1910.333(b)(2)(iv)(A): Before circuits or equipment were worked as deenergized, a qualified person did not operate the equipment operating controls or otherwise verify that the equipment could not be restarted:  a) 7331 William Ave. Allentown, PA - on or about April 21, 2016, employees performed electrical work on pressure chambers removing and installing heat lamp assemblies, but the employer did not ensure a qualified person verified that the equipment could not be restarted prior to working as de-energized.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.333 B02 IV B

Serious Gravity 5 1 instance 37 exposed
Issued
May 25, 2016
Abate by
Jun 14, 2016
Penalty
Initial $0 · Current $0
29 CFR 1910.333(b)(2)(iv)(B): Before circuits or equipment was worked as deenergized, a qualified person did not use test equipment to test the circuit elements and electrical parts of equipment to which employees would be exposed and did not verify that they were deenergized.  a) 7331 William Ave. Allentown, PA - on or about April 21, 2016, employees performed electrical work on pressure chambers removing and installing heat lamp assemblies, but a qualified person did not use test equipment to test the circuit elements and electrical parts to verify that they were de-energized.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Morgan Advanced Ceramics, INC.'s full OSHA safety record →