WILMINGTON, DE —
OSHA Inspection: DAVIS YOUNG ASSOCIATES INC
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of DAVIS YOUNG ASSOCIATES INC in 811 OWLS NEST ROAD, WILMINGTON, DE 19807 (NAICS 238140). OSHA activity number 341419521.
Where did this inspection happen?
- Establishment
- DAVIS YOUNG ASSOCIATES INC
- Site address
- 811 OWLS NEST ROAD
- City
- WILMINGTON
- State
- DE
- ZIP
- 19807
- Mailing
- PO BOX 451, MONTCHANIN, DE 19710
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 9
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.100 A
- Issued
- Abate by
- Penalty
- Initial $2850.00 · Current $1853.00 Reduced
General-duty citation text
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets: (a) 811 Owls Nest Road, Greenville, DE 19807 (Scaffolding for Stone Masonry Wall) - On or about April 21, 2016, employees were not wearing protective helmets while they walked on the ground below other employees working above from a scaffolding platform. Employees on the ground were susceptible to the possibility of head injury if an employee working above was to accidentally displace an object such as a masonry stone over a leading edge of the platform above where an employee on the ground was positioned. Pursuant to 29 CFR 1903.19, the employer must submit abatement certification, required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1852.5
- — Z (S) $2850
1926.451 H01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(h)(1): Each employee on a scaffold was not provided with additional protection from falling hand tools, debris, and other small objects through the installation of toeboards: (a) 811 Owls Nest Road, Greenville, DE 19807 (Scaffolding for Stone Masonry Wall) - On or about April 21, 2016, employees on the ground were susceptible to being struck by falling objects as toeboards or another protective system to prevent employees working above from accidentally displacing objects such as hand tools on masonry stone over the edge of the platform above an employee on the ground directly below. Pursuant to 29 CFR 1903.19, the employer must submit abatement certification, required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 B01
- Issued
- Abate by
- Penalty
- Initial $4988.00 · Current $3242.00 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): (a) 811 Owls Nest Road, Greenville, DE 19807 (Scaffolding for Stone Masonry Wall) - On or about April 21, 2016, employees working from a scaffolding platform ten feet above the ground were exposed to a fall hazard as this platform was not fully planked. Pursuant to 29 CFR 1903.19, the employer must submit abatement certification and documentation, required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $3242.2
- — Z (S) $4988
1926.451 B05 II
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(b)(5)(ii): The end of a platform greater than 10 feet in length extended over its support more than 18 inches and the platform was not designed and installed so that the cantilevered portion of the platform is able to support employees and/or materials without tipping, or has guardrails which block employee access to the cantilevered end: (a) 811 Owls Nest Road, Greenville, DE 19807 (Scaffolding for Stone Masonry Wall) - On or about April 21, 2016, employees were exposed to a fall hazard as the ends of a plank greater than 10 feet in length extended over the scaffolding supports to lengths greater than 18 inches. Pursuant to 29 CFR 1903.19, the employer must submit abatement certification and documentation, required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 G01
- Issued
- Abate by
- Penalty
- Initial $4988.00 · Current $3242.00 Reduced
General-duty citation text
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section: (a) 811 Owls Nest Road, Greenville, DE 19807 (Scaffolding for Stone Masonry Wall) - On or about April 21, 2016, employees working from a scaffolding platform ten feet above the ground were not provided with a means, such as guradrails or a personal fall arrest system, to prevent them from falling. Pursuant to 29 CFR 1903.19, the employer must submit abatement certification and documentation, required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $3242.2
- — Z (S) $4988
More inspections in this industry (NAICS 238140)
RENO, NV—2026-07-16
DC MASONRY
WINNETKA, IL—2026-07-15
CHICAGO STUCCO CO.
LODI, NJ—2026-07-15
J & O MASONRY CONTRACTORS
DORAVILLE, GA—2026-07-14
SUDLOW CONCRETE, INC.
FLAGLER BEACH, FL—2026-07-14
PLANET DESIGN SERVICES, INC.
More inspections in DE
NEWARK, DE—2026-07-15
ALTRA LAWNCARE AND LANDSCAPING SERVICES, INC.
MILLSBORO, DE—2026-07-14
MOUNTAIRE FARMS, INC.
WILMINGTON, DE—2026-06-25
HATZEL AND BUEHLER, INC.
CAMDEN, DE—2026-06-24
VLC CONSTRUCTION LLC
MILFORD, DE—2026-06-18
PERDUE FARMS INCORPORATED
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341419521.