Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: M&A CONSTRUCTION & REMODELING CORP.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of M&A CONSTRUCTION & REMODELING CORP. in 6712 N. EAST PRAIRIE RD., LINCOLNWOOD, IL 60645 (NAICS 238170). OSHA activity number 341422772.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch M&A Construction & Remodeling Corp. — free Get an email when a new federal OSHA severe-injury report for M&A Construction & Remodeling Corp. is published. One employer, no account, unsubscribe in one click.
Site address
6712 N. EAST PRAIRIE RD.
City
LINCOLNWOOD
State
IL
ZIP
60645
Mailing
6457 N. NEVA AVE., CHICAGO, IL 60631
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238170
Employees
2
Ownership type
A

4 citations on file for this inspection.

1926.102 A01

Serious Gravity 5 1 instance 1 exposed
Issued
Apr 26, 2016
Abate by
May 2, 2016
Penalty
Initial $1,760 · Current $704 Reduced
29 CFR 1926.102(a)(1): Employees were not provided with eye and face protection when machines or operations present potential eye or face injury from physical, chemical, or radiation agents:     a) On April 25, 2016, employees were exposed to eye injury while operating a pneumatic nail gun without the benefit of eye protection.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $704
  • — Z (S) $1760

1926.300 B04 II

Serious Gravity 5 2 instances 2 exposed
Issued
Apr 26, 2016
Penalty
Initial $2,640 · Current $1,056 Reduced
29 CFR 1926.300(b)(4)(ii): The point of operation of machine(s) whose operation exposed an employee to injury was not guarded:     a) On or about April 25, 2016, the cutting blade on a Makita electric saw was not guarded when used to cut materials at the site.       No abatement certification or documentation required for this violation.
Recent events (2)
  • — I (S) $1056
  • — Z (S) $2640

1926.451 B05 II

Serious Gravity 5 2 instances 2 exposed
Issued
Apr 26, 2016
Abate by
May 2, 2016
Penalty
Initial $2,200 · Current $880 Reduced
29 CFR 1926.451(b)(5)(ii): The end of a platform greater than 10 feet in length extended over its support more than 18 inches and the platform was not designed and installed so that the cantilevered portion of the platform is able to support employees without tipping, or has guardrails which block employee access to the cantilevered end:     a) On April 25, 2016, the work platform of the ladder jack scaffolding from which employees worked extended approximately 3 feet over the scaffold end supports.  In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $880
  • — Z (S) $2200

1926.451 G01 I

Serious Gravity 10 2 instances 2 exposed
Issued
Apr 26, 2016
Abate by
May 2, 2016
Penalty
Initial $3,080 · Current $1,232 Reduced
29 CFR 1926.451(g)(1)(i): Each employee on a boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold was not protected by a personal fall arrest system:     a) On April 25, 2016, employees were exposed to the hazard of falling approximately 18 feet while working from ladder jack scaffolding without the benefit of fall protection.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $1232
  • — Z (S) $3080

View M&A Construction & Remodeling Corp.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341422772.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.