NEW HARTFORD, NY —
OSHA Inspection: OPTIMA REENGINEERING & PROJECT MANAGEMENT
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of OPTIMA REENGINEERING & PROJECT MANAGEMENT in 1 SANGERTOWN SQUARE, BILLY BEEZ, NEW HARTFORD, NY 13413 (NAICS 236220). OSHA activity number 341445989.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- OPTIMA REENGINEERING & PROJECT MANAGEMENT
- Site address
- 1 SANGERTOWN SQUARE, BILLY BEEZ
- City
- NEW HARTFORD
- State
- NY
- ZIP
- 13413
- Mailing
- 17945 SKY PARK CIRCLE, SUITE D, IRVINE, CA 92614
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236220
- Employees
- 14
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.404 B01 II
- Issued
- May 18, 2016
- Penalty
- Initial $1,600 · Current $1,120 Reduced
General-duty citation text
29 CFR 1926.404(b)(1)(ii): On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupters for personal protection: a) Northwest corner of work area, on or about 4-28-16: Employees were operating an electrically controlled scissor lift and various power tools, powered through extension cords and receptacles that were not protected by a ground fault circuit interrupter (GFCI).
Recent events (2)
- — I (S) $1120
- — Z (S) $1600
1926.405 A02 II I
- Issued
- May 18, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.405(a)(2)(ii)(I): Flexible cords and cables used for temporary wiring were not protected from damage: a) Northwest corner of work area, on or about 4-28-16: Employees were operating an electrically controlled scissor lift powered through an extension cord that was crushed beneath the lift wheel and damaging the cord.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 G01 VII
- Issued
- May 18, 2016
- Abate by
- May 28, 2016
- Penalty
- Initial $2,000 · Current $1,400 Reduced
General-duty citation text
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section: a) Northwest corner of work area, on or about 4-28-16: Employees were working on a scaffold platform consisting of planks set on top of fabricated play equipment, without fall protection, exposing the employee to a fall hazard of 13 feet 4 inches. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Recent events (2)
- — I (S) $1400
- — Z (S) $2000
1926.602 C01 II
- Issued
- May 18, 2016
- Abate by
- May 28, 2016
- Penalty
- Initial $2,400 · Current $1,680 Reduced
General-duty citation text
29 CFR 1926.602(c)(1)(ii): Modifications or additions which affect the capacity or safe operation of the equipment were made without the manufacturer's written approval: a) Northwest corner of work area, on or about 4-28-16: Employees were working in a scissor lift that was modified to hoist materials in a manner affecting safe operation of the equipment, without the manufacturers approval. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Recent events (2)
- — I (S) $1680
- — Z (S) $2400
More inspections at Optima Reengineering & Project Management
View Optima Reengineering & Project Management's full OSHA safety record →
More inspections in this industry (NAICS 236220)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341445989.