Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: WCP CONSTRUCTION CORP

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of WCP CONSTRUCTION CORP in 1 ROLLING GREEN, AMHERST, MA 01002 (NAICS 238170). OSHA activity number 341461069.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch WCP Construction Corp — free Get an email when a new federal OSHA severe-injury report for WCP Construction Corp is published. One employer, no account, unsubscribe in one click.
Site address
1 ROLLING GREEN
City
AMHERST
State
MA
ZIP
01002
Mailing
222 REVERE ST, WINTHROP, MA 02152
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238170
Employees
12
Ownership type
A

7 citations on file for this inspection.

1926.403 B02

Serious Gravity 5 2 instances 2 exposed
Issued
Jul 18, 2016
Abate by
Jul 22, 2016
Penalty
Initial $1,760 · Current $880 Reduced
29 CFR 1926.403(b)(2): Listed, labeled, and/or certified equipment was not installed and/or used in accordance with instructions included in the listing, labeling, and/or certification:  1 Rolling Green Dr., Amherst: On or about May 3, 2016, employees were:   a) using a relocatable power tap (RPT) to power various power tools, in a wet outdoor location, while the device was intended only for dry, indoor locations per the instructions imprinted into the RPT   b) extension cords were plugged into another extension cord (to extend reach) which is also contrary to the instructions that are attached to the extension cords.  Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19(d)(1).
Recent events (2)
  • — I (S) $880
  • — Z (S) $1760

1926.405 A02 II I

Serious Gravity 5 3 instances 2 exposed
Issued
Jul 18, 2016
Abate by
Jul 22, 2016
Penalty
Initial $1,760 · Current $880 Reduced
29 CFR 1926.405(a)(2)(ii)(I): Flexible cords and cables were not protected from damage.  Flexible cords and cables were passed through doorways or other pinch points,without protection being provided to avoid damage:    a)1 Rolling Green Dr., Amherst: On or about May 3, 2016, active, powered flexible (extension) cords were run through door openings with the door closed against the flexible cord.     Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19(d)(1).
Recent events (2)
  • — I (S) $880
  • — Z (S) $1760

1926.451 G01 VII

Serious Gravity 10 1 instance 10 exposed
Issued
Jul 18, 2016
Abate by
Jul 22, 2016
Penalty
Initial $3,080 · Current $1,540 Reduced
29 CFR 1926.451(g)(1)(vii): For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee was not protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section:  a) 1 Rolling Green Way., Amherst, MA: On or about May 3, 2016, an employee was working on a pump jack scaffold system more than 10 feet above the ground below while outside the guardrail system, which does not meet the requirements in paragraph (g)(4) of this section.   Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19(d)(1).
Recent events (2)
  • — I (S) $1540
  • — Z (S) $3080

1926.452 J02

Serious Gravity 10 10 instances 2 exposed
Issued
Jul 18, 2016
Abate by
Jul 22, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.452(j)(2): Poles were not secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary:  a)1 Rolling Green Dr., Amherst: On or about May 3, 2016, the pump jack scaffold in use at this location was not secured at the bottom of the pump jack legs as required by this standard.   Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19(d)(1).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.453 B02 V

Serious Gravity 5 1 instance 1 exposed
Issued
Jul 18, 2016
Abate by
Jul 22, 2016
Penalty
Initial $2,200 · Current $1,100 Reduced
29 CFR 1926.453(b)(2)(v): A body belt was not worn and/or a lanyard was not attached to the boom or basket when working from an aerial lift:  a)1 Rolling Green Dr., Amherst: On or about May 3, 2016, an employee was working from a raised aerial lift without being tied to the boom or basket as required.  Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19(d)(1).
Recent events (2)
  • — I (S) $1100
  • — Z (S) $2200

1926.1053 B05 I

Serious Gravity 10 1 instance 1 exposed
Issued
Jul 18, 2016
Abate by
Jul 22, 2016
Penalty
Initial $3,080 · Current $1,540 Reduced
29 CFR 1926.1053(b)(5)(i): Non-self-supporting ladders were used at an angle such that the horizontal distance from the top support to the foot of the ladder was more than one-quarter of the working length of the ladder (the distance along the ladder between the foot and the top support):  a)1 Rolling Green Dr., Amherst: On or about May 3, 2016, an employee was using an aluminum extension ladder at a more severe angle, measured to be 1 to 1, than allowed by this standard to reach his scaffold top work location.  Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19(d)(1).
Recent events (2)
  • — I (S) $1540
  • — Z (S) $3080

1926.454 A

Repeat Gravity 10 2 instances 2 exposed
Issued
Jul 18, 2016
Abate by
Aug 11, 2016
Penalty
Initial $6,160 · Current $3,080 Reduced
29 CFR 1926.454(a): The employer did not have each employee who performs work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:    a)1 Rolling Green Dr., Amherst, MA: On or about May 3, 2016, employees working from a pump jack scaffold system had not been trained to recognize the hazards associated with the scaffold in use and/or how to mitigate those hazards.     Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19(d)(1).        WCP Construction Corp was previously cited for a violation of this occupational safety and health standard, 29 CFR 1926 454 (a), which was contained in OSHA inspection number 921566, citation number 1, item number  2 and was affirmed as a final order on September 10, 2013, with respect to a workplace located at 610-622 Main St., Reading, MA
Recent events (2)
  • — I (R) $3080
  • — Z (R) $6160

View WCP Construction Corp's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341461069.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.