Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: CISCO CONSTRUCTION,LLC

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of CISCO CONSTRUCTION,LLC in NEXT TO 118 E. AYERS ST, NEWPORT, DE 19804 (NAICS 238130). OSHA activity number 341488856.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Cisco Construction,Llc — free Get an email when a new federal OSHA severe-injury report for Cisco Construction,Llc is published. One employer, no account, unsubscribe in one click.
Site address
NEXT TO 118 E. AYERS ST
City
NEWPORT
State
DE
ZIP
19804
Mailing
93 REED STREET, FRANKFORD, DE 19945
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
6
Ownership type
A

3 citations on file for this inspection.

1926.501 B01

Serious Gravity 5 1 instance 4 exposed
Issued
Jul 7, 2016
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems.  a) Near 118 Ayers St. Newport, DE-On May 19, 2016, the employer did not ensure that employees installing trusses were protected from a fall hazard of approximately 24 feet above ground level.      Pursuant to 29 CFR 1903.19, the employer must submit abatement certification and documentation, required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written documentation.
Recent events (1)
  • — Z (S) $2000

1926.503 A01

Serious Gravity 1 1 instance 4 exposed
Issued
Jul 7, 2016
Abate by
Jul 26, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards:  a) Near 118 Ayers St. Newport, DE-The employer did not ensure that employees  exposed to a fall hazard of approximately 24 feet above ground level ,were trained in fall protection.  Observed on 19 May 2016.   Note: Pursuant to 29 CFR 1903.19, the employer must submit abatement certification, required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.100 A

Serious Gravity 5 1 instance 6 exposed
Issued
Jul 7, 2016
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets:  a)  Near 118 E. Ayer St, Newport, DE-On May 19, 2016, the employer did not ensure that employees rigging and observing the lifting and receiving of trusses were protected by protective helmets.     Pursuant to 29 CFR 1903.19, the employer must submit abatement certification and documentation, required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written documentation.
Recent events (1)
  • — Z (S) $2000

View Cisco Construction,Llc's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341488856.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.