LEESPORT, PA —
OSHA Inspection: NOLL PALLET & LUMBER INCORPORATED
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of NOLL PALLET & LUMBER INCORPORATED in 58 ORCHARD LANE, LEESPORT, PA 19533 (NAICS 321920). OSHA activity number 341505253.
Where did this inspection happen?
- Establishment
- NOLL PALLET & LUMBER INCORPORATED
- Site address
- 58 ORCHARD LANE
- City
- LEESPORT
- State
- PA
- ZIP
- 19533
- Mailing
- PO BOX 706, LEESPORT, PA 19533
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 321920
- Employees
- 27
- Ownership type
- A
Citations
7 citations on file for this inspection.
1910.147 C04 I
- Issued
- Abate by
- Penalty
- Initial $4988.00 · Current $3741.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) 58 Orchard Lane, Leesport Pennsylvania - The employer did not develop, document and utilize energy control procedures when equipment had more than one source of energy, on or about May 25, 2016. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $3741
- — Z (S) $4988
1910.147 C07 I A
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(7)(i)(A): Authorized employee(s) did not receive training in the recognition of applicable hazardous energy sources, the type and magnitude of the energy available in the workplace, and the methods and means necessary for energy isolate (a) 58 Orchard Lane, Leesport Pennsylvania - Employees change the blades of such equipment as a band saw and trim saw. The employer did not provided training to employees on the applicable hazardous energy sources, type and magnitude of energy, and the methods and means necessary for energy isolation , on or about May 25, 2016. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C07 I B
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(7)(i)(B): Each affected employee shall be instructed in the purpose and use of the energy control procedure. (a) 58 Orchard Lane, Leesport Pennsylvania - The employer did not provide training to affected employees, on or about May 25, 2016. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.157 G02
- Issued
- Abate by
- Penalty
- Initial $3741.00 · Current $2806.00 Reduced
General-duty citation text
29 CFR 1910.157(g)(2): The educational program to familiarize employees with the general principles of fire extinguisher use and the hazards involved with incipient stage fire fighting was not provided to all employees upon initial employment, and at least annually thereafter: (a) 58 Orchard Lane, Leesport Pennsylvania - The employer did not provide yearly training on the general principles for fire extinguisher use and the hazards involved with incipient stage fire fighting, on or about May 27, 2016. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $2805.75
- — Z (S) $3741
1910.178 L04 III
- Issued
- Penalty
- Initial $3742.00 · Current $2807.00 Reduced
General-duty citation text
29 CFR 1910.178(l)(4)(iii): An evaluation of each powered industrial truck operator's performance was not being conducted at least once every three years: (a) 58 Orchard Lane, Leesport Pennsylvania - The employer did not provide an evaluation of each powered industrial truck operator at least once every three years, on or about May 27, 2016. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $2806.5
- — Z (S) $3742
1910.305 G01 IV A
- Issued
- Penalty
- Initial $3180.00 · Current $2385.00 Reduced
General-duty citation text
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: (a) 58 Orchard Lane, Leesport Pennsylvania - An extension cord was used to supply power to an enclosureless dust collector. The employer did not ensure that flexible cords were not used as a substitute for fixed wiring, on or about May 27, 2016. No abatement certification or documentation required.
Recent events (2)
- — I (S) $2385
- — Z (S) $3180
1910.305 G02 III
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.305(g)(2)(iii): Flexible cords and cables were not connected to devices and fittings so that strain relief was provided that would prevent pull from being directly transmitted to joints or terminal screws: (a) 58 Orchard Lane, Leesport Pennsylvania - An extension cord powered an enclosureless dust collector. The employer did not ensure that the strain relief was directly connected to the joints or terminal screws, on or about May 27, 2016. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 321920)
LAKELAND, FL—2026-07-16
ELIJAH WHOLESALE, LLC.
DECATUR, GA—2026-07-15
PALLETS ACQUISITION LLC
CLANTON, AL—2026-07-14
SPECWOOD PRODUCTS, INC.
FITCHBURG, MA—2026-07-10
KELLEY WOOD PRODUCTS, INC.
WASHINGTON COURT HOUSE, OH—2026-07-09
HALLIDAY LUMBER, LLC
More inspections in PA
PHILADELPHIA, PA—2026-07-16
URUS CONSTRUCTION CORPORATION
JEFFERSON HILLS, PA—2026-07-16
MARATHON PETROLEUM COMPANY ASPHALT TERMINAL
SMITHFIELD, PA—2026-07-16
CARLISLE CONSTRUCTION MATERIALS
PITTSBURGH, PA—2026-07-15
DREAM GREENER LAWN & LANDSCAPE
COCHRANTON, PA—2026-07-15
CRAWFORD COUNTY HARDWOODS, LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341505253.