OSHA Inspection: GUZZO MASONRY INC.

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of GUZZO MASONRY INC. in 515 BRIDDLE DRIVE, WILMINGTON, DE 19808 (NAICS 238140). OSHA activity number 341517241.

Watch Guzzo Masonry INC. — free Get an email when a new federal OSHA severe-injury report for Guzzo Masonry INC. is published. One employer, no account, unsubscribe in one click.
Establishment
GUZZO MASONRY INC.
Site address
515 BRIDDLE DRIVE
City
WILMINGTON
State
DE
ZIP
19808
Mailing
3501 D'IPPOLITO DRIVE, VINELAND, NJ 08360
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
3
Ownership type
A

7 citations on file for this inspection.

1926.451 B01

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $9603.00 · Current $9603.00
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units, and the space between the platform and the uprights is no:  a) 515 Briddle Drive, Wilmington, DE-On or about June 2, 2016, the employer failed to provide fully planked platforms at all working levels.   Note: Pursuant to 29 CFR 1903.19, the employer must submit abatement certification and documentation, required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written documentation.
Recent events (3)
  • — J (S) $9603
  • — C (S) $9603
  • — Z (S) $9603

1926.451 F04

Deleted Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(f)(4): Part(s) of a scaffold that were damaged or weakened, such that the scaffold's strength was less than that required by paragraph (a) of this section, were not immediately repaired, replaced, braced to meet those provisions, nor removed from service until repaired.  a) 515 Briddle Drive, Wilmington, DE-On or about June 2, 2016, the employer failed to replace or remove from service any weakened or damaged wood plank used as a platform or mudsill.     Note: Pursuant to 29 CFR 1903.19, the employer must submit abatement certification and documentation, required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written documentation.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1926.451 C02 I

Deleted Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $9603.00 · Current $0.00 Reduced
29 CFR 1926.451(c)(2)(i): Footings were not level, sound, rigid, and capable of supporting the loaded scaffold without settling or displacement:  a) 515 Briddle Drive, Wilmington, DE-On  or about June 2, 2016, the employer failed to provide a footing that were capable of supporting the loaded scaffold without displacement.     Note: Pursuant to 29 CFR 1903.19, the employer must submit abatement certification and documentation, required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written documentation.
Recent events (3)
  • — J (S) $0
  • — C (S) $9603
  • — Z (S) $9603

1926.452 C03

Deleted Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $9603.00 · Current $0.00 Reduced
29 CFR 1926.452(c)(3): Frames and panels were not joined together vertically by coupling or stacking pins or equivalent means:  a) 515 Briddle Drive, Wilmington, DE-On or about June 2, 2016, the employer failed to join the scaffold's frames and panels vertically by coupling or stacking pins.   Note:  Pursuant to 29 CFR 1903.19, the employer must submit abatement certification and documentation, required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written documentation.
Recent events (3)
  • — F (S) $0
  • — C (S) $9603
  • — Z (S) $9603

1926.451 G01 IV

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $9603.00 · Current $9603.00
29 CFR 1926.451(g)(1)(iv): Each employee on a self-contained adjustable scaffold was not protected by a guardrail system with a minimum 200 pound toprail capacity.  a) 515 Briddle Drive, Wilmington, DE-On or about June 2, 2016, the employer failed to protect the employees by a guardrail system.   Note:  Pursuant to 29 CFR 1903.19, the employer must submit abatement certification and documentation, required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written documentation.
Recent events (3)
  • — J (S) $9603
  • — C (S) $9603
  • — Z (S) $9603

1926.454 A

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards.  a) 515 Briddle Drive, Wilmington, DE-On or about June 2, 2016, the employer failed to train employees who perform work while on the scaffold to recognize hazards associated with the type of scaffold used and to minimize those hazards.   Note:  Pursuant to 29 CFR 1903.19, the employer must submit abatement certification and documentation, required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written documentation.
Recent events (3)
  • — J (S) $0
  • — C (S) $0
  • — Z (S) $0

1926.451 E01

Repeat Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $19205.00 · Current $19205.00
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.    a) 515 Briddle Drive, Wilmington, DE-On or about June 2, 2016, the employer failed to provide a ladder, hook-on ladder, stair tower to access the scaffold.   Guzzo Stucco Masonry was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29 CFR 1926.451(e)(1), which was contained in OSHA inspection number 950677, citation number 1, item number 1 and was affirmed as a final order on March 20, 2014, with respect to a workplace located at 2310 Schoersville Road, Bethlehem, PA.  Note:  Pursuant to 29 CFR 1903.19, the employer must submit abatement certification and documentation, required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written documentation.
Recent events (3)
  • — J (R) $19205
  • — C (R) $19205
  • — Z (R) $19205

View GUZZO MASONRY INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341517241.