CHICAGO, IL —
OSHA Inspection: MANUEL LARA DBA LARA CONSTRUCTION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of MANUEL LARA DBA LARA CONSTRUCTION in 742 N. WOLCOTT AVE., CHICAGO, IL 60622 (NAICS 238140). OSHA activity number 341522811.
Where did this inspection happen?
- Establishment
- MANUEL LARA DBA LARA CONSTRUCTION
- Site address
- 742 N. WOLCOTT AVE.
- City
- CHICAGO
- State
- IL
- ZIP
- 60622
- Mailing
- 455 N. AVERS AVE., CHICAGO, IL 60624
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 4
- Ownership type
- A
Citations
14 citations on file for this inspection.
1903.19 C01
- Issued
- Abate by
- Penalty
- Initial $300.00 · Current $125.00 Reduced
General-duty citation text
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: Manuel Lara dba Lara Construction, failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected: Citation Number Item Number Abatement Date 01 01 06/24/2016 01 02 06/24/2016 01 03 06/24/2016 01 04a 06/24/2016 01 04b 06/24/2016 01 04b 06/24/2016 01 04c 06/24/2016 01 05 06/24/2016 01 06a 06/24/2016 01 06b 06/24/2016 01 07 06/24/2016 01 08 06/24/2016 01 09 07/22/2016 01 10 06/24/2016 In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
- — F (O) $125
- — C (O) $300
- — Z (O) $300
1926.100 A
- Issued
- Abate by
- Penalty
- Initial $1600.00 · Current $640.00 Reduced
General-duty citation text
29 CFR 1926.100(a): Employees were not protected by protective helmets while working in areas where there was a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns: a) On June 3, 2016, employees were not wearing protective helmets where there was a possible danger of head injury. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
- — F (S) $640
- — C (S) $1600
- — Z (S) $1600
1926.102 A01
- Issued
- Abate by
- Penalty
- Initial $1600.00 · Current $640.00 Reduced
General-duty citation text
29 CFR 1926.102(a)(1): Employees were not provided with eye and face protection equipment when machines or operations present potential eye or face injury from physical, chemical, or radiation agents: a) On June 3, 2016, employees were exposed to eye injury while operating a chipping hammer without eye protection during masonry work. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
- — F (S) $640
- — C (S) $1600
- — Z (S) $1600
1926.451 B02
- Issued
- Abate by
- Penalty
- Initial $2000.00 · Current $800.00 Reduced
General-duty citation text
29 CFR 1926.451(b)(2): Scaffold platforms and walkways were not at least 18 inches wide: a) On June 3, 2016, employees were exposed to the hazard of falling, approximately 25 feet to the ground, while performing masonry work from a two-point adjustable suspension scaffold platform that was not at least 18 inches wide. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
- — F (S) $800
- — C (S) $2000
- — Z (S) $2000
1926.451 D03 IX
- Issued
- Abate by
- Penalty
- Initial $2000.00 · Current $800.00 Reduced
General-duty citation text
29 CFR 1926.451(d)(3)(ix): Tiebacks were not secured to a structurally sound anchorage on the building or structure: a) On June 3, 2016, employees were exposed to the hazard of falling while working from a two-point adjustable suspension scaffold, supported by the parapet hooks, secured against movement by tiebacks connected to the 55 gallon drum filled with water. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
- — F (S) $800
- — C (S) $2000
- — Z (S) $2000
1926.451 D03 X
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(d)(3)(x): Tiebacks were not installed perpendicular to the face of the building or structure, nor were opposing angle tiebacks installed: a) On June 3, 2016, employees were exposed to the hazard of falling while working from a two-point adjustable suspension scaffold, supported by the parapet hooks, secured against movement by tiebacks at the angle other than right angle to the face of the building. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1926.451 G03 IV
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(g)(3)(iv): Vertical lifelines, independent support lines, and suspension ropes were attached to the same point of anchorage: a) On June 3, 2016, employees were exposed to the hazard of falling while working from a two-point adjustable suspension scaffold, supported by the parapet hooks, secured against movement by tiebacks connected to the same point of anchorage. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1926.451 D05 II
- Issued
- Abate by
- Penalty
- Initial $2000.00 · Current $800.00 Reduced
General-duty citation text
29 CFR 1926.451(d)(5)(ii): Suspension scaffold support devices such as cornice hooks, roof hooks, roof irons, parapet clamps, or similar devices were not supported by bearing blocks: a) On June 3, 2016, employees were exposed to the hazard of falling while working from a two-point adjustable suspension scaffold platform, supported by the parapet hooks without the use of bearing blocks. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
- — F (S) $800
- — C (S) $2000
- — Z (S) $2000
1926.451 D16
- Issued
- Abate by
- Penalty
- Initial $2000.00 · Current $800.00 Reduced
General-duty citation text
29 CFR 1926.451(d)(16): The suspension scaffold power-operated hoist or manually operated hoist did not have, in addition to the normal operating brake, a braking device or locking pawl which engages automatically when a hoist makes either of the following uncontrolled movements: an instantaneous change in momentum or an accelerated overspeed. a) On June 3, 2016, employees were working from a two-point adjustable suspension scaffold which did not have a breaking device or locking pawl. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
- — F (S) $800
- — C (S) $2000
- — Z (S) $2000
1926.451 D17
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(d)(17): Manually operated hoists did not have a positive crank force to descend: a) On June 3, 2016, employees were working from a two-point adjustable suspension scaffold where the manually operated hoist did not have a positive crank force to descend. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1926.451 E01
- Issued
- Abate by
- Penalty
- Initial $2000.00 · Current $800.00 Reduced
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used: a) On June 3, 2016, employees were not provided with safe access to a two-point adjustable suspension scaffold platform being used at an elevation of approximately 25 feet above the ground. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
- — F (S) $800
- — C (S) $2000
- — Z (S) $2000
1926.451 G01 II
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $1130.00 Reduced
General-duty citation text
29 CFR 1926.451(g)(1)(ii): Each employee on a single-point or two-point adjustable suspension scaffold was not protected by both a personal fall arrest system and a guardrail system: a) On June 3, 2016, employees engaged in masonry work were not protected from hazards of falling while working from a two-point adjustable suspension scaffold platform elevated approximately 25 feet above the ground. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (S) $1130
- — C (S) $2800
- — Z (S) $2800
1926.454 A
- Issued
- Abate by
- Penalty
- Initial $2000.00 · Current $800.00 Reduced
General-duty citation text
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards: a) On or about June 3, 2016, employer did not provide training to each employee in order to recognize hazards associated with working from a two-point adjustable suspension scaffold platform and to understand procedures to control or minimize those hazards. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
- — F (S) $800
- — C (S) $2000
- — Z (S) $2000
1926.501 B13
- Issued
- Abate by
- Penalty
- Initial $1600.00 · Current $640.00 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) On June 3, 2016, employees were not protected from the hazard of falling to the lower level while performing masonry work around unguarded skylight. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
- — F (S) $640
- — C (S) $1600
- — Z (S) $1600
More inspections in this industry (NAICS 238140)
RENO, NV—2026-07-16 00:00:00
DC MASONRY
WINNETKA, IL—2026-07-15 00:00:00
CHICAGO STUCCO CO.
LODI, NJ—2026-07-15 00:00:00
J & O MASONRY CONTRACTORS
DORAVILLE, GA—2026-07-14 00:00:00
SUDLOW CONCRETE, INC.
FLAGLER BEACH, FL—2026-07-14 00:00:00
PLANET DESIGN SERVICES, INC.
More inspections in IL
DEERFIELD, IL—2026-07-16 00:00:00
JOHN BURNS CONSTRUCTION COMPANY, LLC
BANNOCKBURN, IL—2026-07-16 00:00:00
BUILDER SERVICES GROUP, INC. DBA CJ INSULATION
BANNOCKBURN, IL—2026-07-16 00:00:00
ROOFING H.P. LLC
HIGHLAND PARK, IL—2026-07-16 00:00:00
UNITED PLUMBING AND DRAIN, INC.
FRANKLIN PARK, IL—2026-07-16 00:00:00
B & M PLASTIC INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341522811.