OSHA Inspection: WINDY CITY RE LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of WINDY CITY RE LLC in 2036 S. MICHIGAN AVENUE, CHICAGO, IL 60616 (NAICS 236118). OSHA activity number 341638765.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Windy City RE LLC — free Get an email when a new federal OSHA severe-injury report for Windy City RE LLC is published. One employer, no account, unsubscribe in one click.
Establishment
WINDY CITY RE LLC
Site address
2036 S. MICHIGAN AVENUE
City
CHICAGO
State
IL
ZIP
60616
Mailing
105 W. MADISON SUITE 1401, CHICAGO, IL 60602
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236118
Employees
11
Ownership type
A

4 citations on file for this inspection.

1926.20 B01

Serious Gravity 1 1 instance 1 exposed
Issued
Nov 16, 2016
Abate by
Dec 13, 2016
Penalty
Initial $2,352 · Current $1,411 Reduced
29 CFR 1926.20(b)(1): The employer did not initiate and maintain programs necessary to ensure compliance with the Occupational Safety and Health Standards:            a)  On or about July 14, 2016 - at the above addressed jobsite, the employer did not develop, implement or maintain safety and health programs to aid in accident prevention responsibilities in the workplace.
Recent events (2)
  • — I (S) $1411.2
  • — Z (S) $2352

1926.403 B02

Serious Gravity 5 2 instances 1 exposed
Issued
Nov 16, 2016
Penalty
Initial $3,135 · Current $1,881 Reduced
29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification:    a) On or about July 14, 2016, at the above addressed jobsite, an employee conducting tasks and responsibilities was exposed to electrical hazards were exposed to electrical hazards while square electrical boxes were sitting on the floor, not mounted to a wall and used to provide power to the temporary lighting of the site.    b)   On or about July 14, 2016, at the above addressed jobsite, contractors conducting tasks and responsibilities per their work orders and contracts were exposed to electrical hazards while using square electrical boxes that are sitting on the floor and not mounted to a wall.
Recent events (2)
  • — I (S) $1881
  • — Z (S) $3135

1926.405 A02 II E

Serious Gravity 5 2 instances 1 exposed
Issued
Nov 16, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.405(a)(2)(ii)(E): Lamps used in temporary wiring for general illumination were not protected from accidental contact or breakage:  a) On or about July 14, 2016, at the above addressed jobsite, an employee conducting tasks and responsibilities was exposed to electrical hazards posed by the bulbs of the temporary lighting not being protected from contact and/or breakage.  b)   On or about July 14, 2016, at the above addressed jobsite, contractors conducting tasks and responsibilities per their work orders and contracts were exposed to electrical hazards posed by the bulbs of the temporary lighting not being protected from contact and/or breakage.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.405 A02 II F

Serious Gravity 5 2 instances 1 exposed
Issued
Nov 16, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.405(a)(2)(ii)(F): Temporary lights were suspended by their electric cords when such lights and cords were not designed for suspension:  a) On or about July 14, 2016, at the above addressed jobsite, an employee conducting tasks and responsibilities was exposed to electrical hazards posed by the bulbs of the temporary lighting that was suspended by its electrical cord(s) which were not designed for such a purpose.  b)   On or about July 14, 2016, at the above addressed jobsite, contractors conducting tasks and responsibilities per their work orders and contracts were exposed to electrical hazards posed by the bulbs of the temporary lighting that was suspended by its electrical cord(s) which were not designed for such a purpose.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Windy City RE LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341638765.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.