Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,193,745Inspections Most recent open 2026-08-06 Last loaded 2026-08-10

OSHA Inspection: ELLIS ELECTRICAL CONTRACTORS, LLC.

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of ELLIS ELECTRICAL CONTRACTORS, LLC. in 1032 METROPOLITIAN PARKWAY, ATLANTA, GA 30342 (NAICS 238210). OSHA activity number 341654283.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Ellis Electrical Contractors, LLC. for free Get an email when a new federal OSHA severe-injury report for Ellis Electrical Contractors, LLC. is published. One employer, no account, unsubscribe in one click.
Site address
1032 METROPOLITIAN PARKWAY
City
ATLANTA
State
GA
ZIP
30342
Mailing
P.O. BOX 5466, CANTON, GA 30114
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238210
Employees
25
Ownership type
A

4 citations on file for this inspection.

1926.405 A02 II C

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 13, 2016
Abate by
Oct 7, 2016
Penalty
Initial $3,563 · Current $2,138 Reduced
29 CFR 1926.405(a)(2)(ii)(C): Receptacles were connected to the same ungrounded conductor of multiwire circuits supplying temporary lighting:    a.  Worksite - The employer exposed employees to electrical shock hazards of 120 volts by not separating electrical circuits from the other circuits used to supply electricity in the building thereby exposing employees to struck-by and other hazardous conditions during emergency situations.
Recent events (2)
  • · I (S) $2137.8
  • · Z (S) $3563

1926.405 A02 II F

Serious Gravity 1 1 instance 1 exposed
Issued
Sep 13, 2016
Abate by
Oct 7, 2016
Penalty
Initial $2,138 · Current $1,283 Reduced
29 CFR 1926.405(a)(2)(ii)(F): Temporary lights were suspended by their electric cords when such lights and cords were not designed for suspension:    a.  Worksite - The temporary electrical lights were suspended by their Romex electrical cords which were not rated for severe duty which then exposed employees to fire hazards.
Recent events (2)
  • · I (S) $1282.8
  • · Z (S) $2138

1926.405 A02 II J

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 13, 2016
Abate by
Oct 7, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.405(a)(2)(ii)(J): Flexible cords used with temporary and portable lights were not designed for hard or extra-hard usage:  a.  Worksite - Flexible Romex Cord was used in place of hard duty or extra hard duty electrical cable, exposing employees to electrical shock hazards of 120 volts.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.405 A02 II E

Deleted Serious Gravity 5 1 instance 1 exposed
Issued
Sep 13, 2016
Abate by
Oct 7, 2016
Penalty
Initial $3,563 · Current $0 Reduced
29 CFR 1926.405(a)(2)(ii)(E): Lamps used in temporary wiring for general illumination were not protected from accidental contact or breakage:  a.  Worksite - The temporary electrical lighting was not protected from accidental contact or breakage thereby exposing employees to electrical shock hazards of 120 volts.
Recent events (2)
  • · I (S) $0
  • · Z (S) $3563

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341654283.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.