OSHA Inspection: NATIVE CONTRACTORS INC.

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of NATIVE CONTRACTORS INC. in 1420 GALLATIN ROAD, SOUTH, NASHVILLE, TN 37115 (NAICS 561730). OSHA activity number 341670644.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Native Contractors INC. — free Get an email when a new federal OSHA severe-injury report for Native Contractors INC. is published. One employer, no account, unsubscribe in one click.
Site address
1420 GALLATIN ROAD, SOUTH
City
NASHVILLE
State
TN
ZIP
37115
Mailing
12820 HILLCREST RD. SUITE C-207, DALLAS, TX 75230
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
561730
Employees
49
Ownership type
A

3 citations on file for this inspection.

1910.106 D04 I

Serious Gravity 1 1 instance 5 exposed
Issued
Sep 20, 2016
Abate by
Oct 17, 2016
Penalty
Initial $3,180 · Current $1,272 Reduced
29 CFR 1910.106(d)(4)(i):   "Construction." Inside storage rooms shall be constructed to meet the required fire-resistive rating for their use. Such construction shall comply with the test specifications set forth in Standard Methods of Fire Tests of Building Construction and Materials, NFPA 251-1969. Where an automatic sprinkler system is provided, the system shall be designed and installed in an acceptable manner. Openings to other rooms or buildings shall be provided with noncombustible liquid-tight raised sills or ramps at least 4 inches in height, or the floor in the storage area shall be at least 4 inches below the surrounding floor. Openings shall be provided with approved self-closing fire doors. The room shall be liquid-tight where the walls join the floor. A permissible alternate to the sill or ramp is an open-grated trench inside of the room which drains to a safe location. Where other portions of the building or other properties are exposed, windows shall be protected as set forth in the Standard for Fire Doors and Windows, NFPA No. 80-1968, which is incorporated by reference as specified in Sec. 1910.6, for Class E or F openings. Wood at least 1 inch nominal thickness may be used for shelving, racks, dunnage, scuffboards, floor overlay, and similar installations.     a) On or about 8/3/2016 (and at times prior to), Native Contractors employees at the VA National Cemetery located at 1400 Gallatin Pike South in Nashville, TN were exposed to hazardous materials in the flammable storage room which did not have a liquid-tight raised sill or ramp at least 4 inches in height or an approved self-closing fire door.     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1272
  • — Z (S) $3180

1910.106 D04 IV

Serious Gravity 1 1 instance 5 exposed
Issued
Sep 20, 2016
Abate by
Oct 17, 2016
Penalty
Initial $3,180 · Current $1,272 Reduced
29 CFR 1910.106(d)(4)(iv): Ventilation. Every inside storage room shall be provided with either a gravity or a mechanical exhaust ventilation system. Such system shall be designed to provide for a complete change of air within the room at least six times per hour. If a mechanical exhaust system is used, it shall be controlled by a switch located outside of the door. The ventilating equipment and any lighting fixtures shall be operated by the same switch. A pilot light shall be installed adjacent to the switch if Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), are dispensed within the room. Where gravity ventilation is provided, the fresh air intake, as well as the exhaust outlet from the room, shall be on the exterior of the building in which the room is located.     a) On or about 8/3/2016 (and at times prior to), Native Contractors employees at the VA National Cemetery located at 1400 Gallatin Pike South in Nashville, TN were exposed to hazardous materials in the flammable storage room which did not have a gravity or a mechanical exhaust ventilation system.     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1272
  • — Z (S) $3180

1904.32 B02

Other-than-serious 1 instance 5 exposed
Issued
Sep 20, 2016
Abate by
Oct 17, 2016
Penalty
Initial $595 · Current $238 Reduced
29 CFR 1904.32(b)(2): The Summary of Work-Related Injuries and Illnesses (OSHA Form 300A or equivalent) was incomplete.    a) On or about 8/3/2016, Native Contractors at the VA National Cemetery located at 1400 Gallatin Pike South in Nashville, posted the OSHA 300 A Form but had the company's Dallas, TX address on it instead of the Cemetery's address, it did not have the year date for which it was for, and there was no date as to when it was signed.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (O) $238
  • — Z (O) $595

View Native Contractors INC.'s full OSHA safety record →