PITI, GU —
OSHA Inspection: NEW MILESTONE CONSTRUCTION
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of NEW MILESTONE CONSTRUCTION in MAMA SANDY ROAD TRACT: 2022, LOT: 15A-3-R1, PITI, GU 96915 (NAICS 236115). OSHA activity number 341743193.
Where did this inspection happen?
- Establishment
- NEW MILESTONE CONSTRUCTION
- Site address
- MAMA SANDY ROAD TRACT: 2022, LOT: 15A-3-R1
- City
- PITI
- State
- GU
- ZIP
- 96915
- Mailing
- P.O. BOX 10232, TAMUNING, GU 96931
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236115
- Employees
- 3
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.1053 B04
- Issued
- Penalty
- Initial $1227.00 · Current $859.00 Reduced
General-duty citation text
29 CFR 1926.1053(b)(4): Ladders were not used for the purpose for which they were designed. a) At the New Milestone Construction, residential construction project, A-frame type, fiberglass step ladders were used as scaffolding support for painting.
Recent events (2)
- — I (S) $858.9
- — Z (S) $1227
1926.25 A
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.25(a): During the course of construction, alteration, or repairs, form and scrap lumber with protruding nails, and all other debris, was not kept cleared from work areas, passageways, and stairs, in and around buildings or other structures. a) At the New Milestone Construction, residential construction project, construction debris and scrap plywood/lumber was not cleared from work areas, poor housekeeping.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1926.404 A02
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.404(a)(2): A grounded conductor was attached to a terminal or lead so as to reverse designated polarity. a) At the New Milestone Construction residential construction project, the yellow extension cord used for temporary wiring had reverse polarity, the hot conductor was connected to the neutral conductor.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections in this industry (NAICS 236115)
CARSON CITY, NV—2026-07-16
LT BUILDERS
FAIRVIEW, TN—2026-07-16
DRB GROUP TENNESSEE, LLC
DOVER, NH—2026-07-15
KNOX MARSH DEVELOPMENT LLC
VIENNA, VA—2026-07-15
OMARI CONSTRUCTION LLC
NORFOLK, VA—2026-07-15
SUPERIOR PRIDE INC
More inspections in GU
BARRIGADA, GU—2026-01-22
DURI CORPORATION
TAMUNING, GU—2026-01-21
DLR CORPORATION
BARRIGADA, GU—2026-01-21
DURI CORPORATION
TAMUNING, GU—2026-01-20
MG CONSTRUCTION COMPANY
BARRIGADA, GU—2026-01-20
PFM -VERTEX-LMS
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341743193.