OSHA Inspection: NITROUS OXIDE CORPORATION

Federal Agency inspection · Safety discipline

On , OSHA opened a federal Agency safety inspection of NITROUS OXIDE CORPORATION in 650 CHEMSTRAND ROAD, CANTONMENT, FL 32533 (NAICS 325120). OSHA activity number 341745065.

Watch Nitrous Oxide Corporation — free Get an email when a new federal OSHA severe-injury report for Nitrous Oxide Corporation is published. One employer, no account, unsubscribe in one click.
Site address
650 CHEMSTRAND ROAD
City
CANTONMENT
State
FL
ZIP
32533
Mailing
650 CHEMSTRAND RD, CANTONMENT, FL 32533
Inspection type
Federal Agency (M)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
325120
Employees
9
Ownership type
A

1 citation on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance 9 exposed
Issued
Abate by
Penalty
Initial $12471.00 · Current $12471.00
OSH ACT of 1970 Section (5)(a)(1): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees:    a. On August 28, 2016, an employee was exposed to nitrous oxide explosive decomposition while loading transport trailer 182 with liquid nitrous oxide.     Among other methods, one feasible and acceptable method to correct this hazard would be to follow safety guidelines for preventing nitrous oxide decomposition that are outlined in Compressed Gas Association standard G-8.3. Such as:     Continuous monitoring of transport tank fill process - CGA G-8.3 Section 8.2  Transport Tanks - During filling, the pump discharge pressure shall be monitored to ensure that the pump operates within the specified performance conditions. The pressure and the level indicator (if any) of the transport tank shall be monitored to avoid overfilling and at completion of filling the full try-cock shall be opened to verify that the filling quantity is correct. If designed for this_ function, the vapor return may serve as the full try-cock.       Automatic pump shut off when fill level reached - CGA G-8.3 Section 8.2- During filling, the pump pressure shall be monitored to ensure that the pump operates within the specified performance conditions. The pressure and the level indicator of the transport tank shall be monitored to avoid overfilling and at completion of filling the full try-cock shall be opened to verify that the filling quantity is correct. If designed for this function, the vapor return may serve as the full try-cock.       MOC for Pump Change (centrifugal versus gear) - CGA G-8.3 Section 7.4.1- Section 5.10  Maintenance Procedures - Modifications to a nitrous oxide installation or non-routine Maintenance work shall not be made without a risk assessment, which could result in a  management of change and requirement for a work permit.       Pump strainer containing steel wool - CGA G-8.3 Section 7.4.1- The suction line shall be fitted with a filter that shall have as little pressure drop as possible.       Bonding straps at loading station - CGA G-8, Section 7.3.4  Grounding - All parts of the transport tank shall be bonded to ensure electrical continuity.
Recent events (2)
  • — I (S) $12471
  • — Z (S) $12471