Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: BAYNE DEVELOPMENT GROUP, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of BAYNE DEVELOPMENT GROUP, LLC in 39 EAST MAY STREET, WINDER, GA 30680 (NAICS 236220). OSHA activity number 341753655.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Bayne Development Group, LLC — free Get an email when a new federal OSHA severe-injury report for Bayne Development Group, LLC is published. One employer, no account, unsubscribe in one click.
Site address
39 EAST MAY STREET
City
WINDER
State
GA
ZIP
30680
Mailing
49 PIEDMONT DRIVE SUITE 107, WINDER, GA 30680
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
1
Ownership type
A

5 citations on file for this inspection.

1926.451 B01

Serious Gravity 5 1 instance 4 exposed
Issued
Sep 27, 2016
Penalty
Initial $2,272 · Current $1,363 Reduced
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units, and the space between the platform and the uprights.  On 9/6/16, at the 39 E. May Street, Winder job site, subcontracted employees were working on levels that were not fully decked and instead had a single deck board installed.
Recent events (2)
  • — I (S) $1363.2
  • — Z (S) $2272

1926.451 C01 I

Serious Gravity 5 1 instance 4 exposed
Issued
Sep 27, 2016
Penalty
Initial $2,272 · Current $1,363 Reduced
29 CFR 1926.451(c)(1)(i): Guys, ties, and braces were not installed at locations where horixontal members support both inner and outer legs.  On 9/6/16, at the 39 E. May Street, Winder job site, employees were working on scaffolds that were not constructed or supported with cross braces at the inner and outer legs leaving the scaffold system unstable.
Recent events (2)
  • — I (S) $1363.2
  • — Z (S) $2272

1926.451 E01

Serious Gravity 5 1 instance 4 exposed
Issued
Sep 27, 2016
Penalty
Initial $2,672 · Current $1,603 Reduced
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access.  On or about 9/6/16, at the 39 East May Street, Winder job site, employees were permitted to climb the cross braces and scaffold frames themselves instead of being provided and required to use a ladder. Scaffolds used at the site were three frames tall.
Recent events (2)
  • — I (S) $1603.2
  • — Z (S) $2672

1926.451 F03

Serious Gravity 5 1 instance 4 exposed
Issued
Sep 27, 2016
Penalty
Initial $2,672 · Current $1,603 Reduced
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity.  On or about 9/6/16, at the 39 East May Street, Winder job site, the employer did not have a competent person inispect scaffolds before permitting employees to work on those scaffolds. Scaffold deficiencies included: no fall protection, cross braces, ladders for access or full decking.
Recent events (2)
  • — I (S) $1603.2
  • — Z (S) $2672

1926.451 G04 I

Serious Gravity 5 1 instance 4 exposed
Issued
Sep 27, 2016
Penalty
Initial $2,672 · Current $1,603 Reduced
29 CFR 1926.451(g)(4)(i): Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews.  On or about 9/6/16, at the 39 East May Street, Winder job site, employees were permitted to work from scaffolds that were not equipped with guardrails. Employees worked at levels of 12 to 18 feet above lower levels without fall protection.
Recent events (2)
  • — I (S) $1603.2
  • — Z (S) $2672

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341753655.