OSHA Inspection: VOGT FINISHES, LLC

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of VOGT FINISHES, LLC in 3209 PENNSYLVANIA AVE, ERIE, PA 16504 (NAICS 238320). OSHA activity number 341754406.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Vogt Finishes, LLC — free Get an email when a new federal OSHA severe-injury report for Vogt Finishes, LLC is published. One employer, no account, unsubscribe in one click.
Establishment
VOGT FINISHES, LLC
Site address
3209 PENNSYLVANIA AVE
City
ERIE
State
PA
ZIP
16504
Mailing
1318 E 12TH ST, ERIE, PA 16503
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238320
Employees
18
Ownership type
A

4 citations on file for this inspection.

1926.501 B01

Serious Gravity 5 1 instance 2 exposed
Issued
Sep 16, 2016
Abate by
Oct 13, 2016
Penalty
Initial $3,563 · Current $2,500 Reduced
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems:          a.) Vogt Finishes, LLC, 3209 Pennsylvania Ave, Erie, Pa 16504, roof of structure, Southwest corner of the First Good Samaritan AME Church, on or about September 6th, 2016 and times prior thereto:  Two employees were performing priming/painting operations on the roof of the First Good Samaritan AME Church and were exposed to fall hazards of approximately 9.4 feet to the ground below.  The employees were not utilizing fall protection during work operations on the roof.
Recent events (2)
  • — I (S) $2500
  • — Z (S) $3563

1910.1200 E01

Serious Gravity 1 1 instance 2 exposed
Issued
Sep 16, 2016
Abate by
Nov 3, 2016
Penalty
Initial $2,138 · Current $900 Reduced
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: (Construction Reference: 1926.59)       a.)  Vogt Finishes, LLC, 3209 Pennsylvania Ave, Erie, Pa 16504, roof of structure, Southwest corner of the First Good Samaritan AME Church, on or about September 6th, 2016 and times prior thereto:  Employees worked with and around hazardous substances including, but not limited to,  Sherman Williams Kem Bond HS B50 WZ-4 Primer during work operations on the roof of the facility.  The employer did not develop and implement a written Hazard Communication Program.
Recent events (2)
  • — I (S) $900
  • — Z (S) $2138

1910.1200 H01

Serious Gravity 1 1 instance 2 exposed
Issued
Sep 16, 2016
Abate by
Nov 3, 2016
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: (Construction Reference: 1926.59)    a.)    Vogt Finishes, LLC, 3209 Pennsylvania Ave, Erie, Pa 16504, roof of structure, Southwest corner of the First Good Samaritan AME Church, on or about September 6th, 2016 and times prior thereto:  Employees worked with and around hazardous substances including, but not limited to,  Sherman Williams Kem Bond HS B50 WZ-4 Primer during work operations on the roof of the facility.  The employer did not provide effective Hazard Communication Training for employees.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.1200 G09

Serious Gravity 1 1 instance 2 exposed
Issued
Sep 16, 2016
Abate by
Nov 3, 2016
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(g)(9): Where employees must travel between workplaces during a workshift, the employer did not maintain the material safety data sheets in each workplace or at the primary workplace facility where employees can immediately obtain information the required information in the case of an emergency: (Construction Reference: 1926.59)  a.)    Vogt Finishes, LLC, 3209 Pennsylvania Ave, Erie, Pa 16504, Southwest corner of the First Good Samaritan AME Church, on or about September 6th, 2016 and times prior thereto:  Employees worked with and around hazardous substances including, but not limited to,  Sherman Williams Kem Bond HS B50 WZ-4 Primer during work operations on the roof of the facility. The employer did not ensure employees had access to the safety data sheet for the Sherman Williams Kem Bond HS B50 WZ-4 primer at the worksite.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341754406.