GRANTVILLE, PA —
OSHA Inspection: HENKELS & MCCOY GROUP, INC.
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of HENKELS & MCCOY GROUP, INC. in SPECTRA ENERGY CORPORATION 480 BOW CREEK ROAD, GRANTVILLE, PA 17028 (NAICS 237120). OSHA activity number 341767747.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- HENKELS & MCCOY GROUP, INC.
- Site address
- SPECTRA ENERGY CORPORATION 480 BOW CREEK ROAD
- City
- GRANTVILLE
- State
- PA
- ZIP
- 17028
- Mailing
- 985 JOLLY ROAD, BLUE BELL, PA 19422
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 237120
- Employees
- 24
- Ownership type
- A
Citations
5 citations on file for this inspection.
1910.134 I05 III
- Issued
- Mar 10, 2017
- Abate by
- Apr 5, 2017
- Penalty
- Initial $7,243 · Current $0 Reduced
05300560501090109130
General-duty citation text
29 CFR 1910.134(i)(5)(iii): The employer did not ensure that compressor(s) used to supply breathing air to respirators were constructed and situated so as to have had suitable in-line air-purifying sorbent beds and filters to further ensure breathing air quality: (Construction Reference 1926.103) a) Station Road, Grantville, Pennsylvania - On or about September 13, 2016, the employer did not ensure that the Sullivan-Palatek 2008 Model # D0185 QH11JDB SN # 28670 [Site # 88435] diesel-powered oil-lubricated air compressor was equipped with suitable in-line air-purifying sorbent beds and filters to ensure breathing air quality. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
- — F (S) $0
- — C (S) $7243
- — Z (S) $7243
1910.134 I05 IV
- Issued
- Mar 10, 2017
- Abate by
- Apr 5, 2017
- Penalty
- Initial $0 · Current $0
05300560501090109130
General-duty citation text
29 CFR 1910.134(i)(5)(iv): The employer did not ensure that compressor(s) used to supply breathing air to respirators had a tag, maintained at the compressor, indicating the most recent filter/sorbent bed change date and the signature of the person authorized by the employer to perform the change: (Construction Reference 1926.103) a) Station Road, Grantville, Pennsylvania - On or about September 13, 2016, the employer did not ensure that the Sullivan-Palatek 2008 Model # D0185 QH11JDB SN # 28670 [Site # 88435] diesel-powered oil-lubricated air was provided with maintenance tags. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1910.134 C01 VI
- Issued
- Mar 10, 2017
- Abate by
- Aug 24, 2017
- Penalty
- Initial $1,016 · Current $1,016
05300560501090109130
General-duty citation text
29 CFR 1910.134(c)(1)(vi): The written program did not contain procedures to ensure adequate air quality, quantity, and flow of breathing air for atmosphere-supplying respirators: (Construction Reference 1926.103) a) Station Road, Grantville, Pennsylvania - On or about September 13, 2016, the employer's written respiratory protection program did not contain specific information on how employees, exposed to 2-part pipe coating epoxy, condensed hydrocarbons, carbon monoxide, respirable particulates not otherwise regulated (PNOR), and respirable crystalline silica, would be assured of breathing at least Grade D quality breathing air. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
- — F (O) $1016
- — C (O) $1016
- — Z (O) $1016
1910.134 C01 VII
- Issued
- Mar 10, 2017
- Abate by
- Aug 24, 2017
- Penalty
- Initial $0 · Current $0
05300560501090109130
General-duty citation text
29 CFR 1910.134(c)(1)(vii): The written program did not contain provisions for training of employees in the respiratory hazards to which they were potentially exposed during routine and emergency situations: (Construction Reference 1926.103) a) Station Road, Grantville, Pennsylvania - On or about September 13, 2016, the employer's written respiratory protection program did not contain specific provisions on training employees on respiratory hazards they were exposed to, such as but not limited to, 2-part pipe coating epoxy, carbon monoxide, respirable particulates not otherwise regulated (PNOR), and respirable crystalline silica. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
- — F (O) $0
- — C (O) $0
- — Z (O) $0
1910.134 C01 IX
- Issued
- Mar 10, 2017
- Abate by
- Apr 26, 2017
- Penalty
- Initial $0 · Current $0
05300560501090109130
General-duty citation text
29 CFR 1910.134(c)(1)(ix): The written respiratory protection program did not contain procedures for regularly evaluating the effectiveness of the program: (Construction Reference 1926.103) a) Station Road, Grantville, Pennsylvania - On or about September 13, 2016, the employer's written respiratory protection program did not contain specific procedures on how the program would be evaluated. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
- — F (O) $0
- — C (O) $0
- — Z (O) $0
More inspections at Henkels & Mccoy Group, INC.
View Henkels & Mccoy Group, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 237120)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341767747.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.