Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: ARCTIC GLACIER USA, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ARCTIC GLACIER USA, INC. in 130 E 42ND STREET, LUBBOCK, TX 79404 (NAICS 312113). OSHA activity number 341768901.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Arctic Glacier USA, INC. — free Get an email when a new federal OSHA severe-injury report for Arctic Glacier USA, INC. is published. One employer, no account, unsubscribe in one click.
Site address
130 E 42ND STREET
City
LUBBOCK
State
TX
ZIP
79404
Mailing
130 E 42ND STREET, LUBBOCK, TX 79404
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
312113
Employees
23
Ownership type
A

8 citations on file for this inspection.

1910.36 G02

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Mar 10, 2017
Abate by
Mar 27, 2017
Penalty
Initial $7,967 · Current $0 Reduced
29 CFR 1910.36(g)(2): Exit access(es) were not at least 28 inches (71.1 cm) wide at all points.  Employees were exposed to physical hazards while working in the engine room where an exit route was less than 28 inches wide.
Recent events (3)
  • — J (S) $0
  • — C (S) $7967
  • — Z (S) $7967

1910.37 A03

Other-than-serious 1 instance 2 exposed
Issued
Mar 10, 2017
Abate by
Mar 27, 2017
Penalty
Initial $0 · Current $0
29 CFR 1910.37(a)(3): Exit route(s) were not kept free and unobstructed:    Employees were exposed to physical and health hazards while working in the engine room where the south east exit route was not kept free from clutter or overflow materials.
Recent events (3)
  • — J (O) $0
  • — C (S) $0
  • — Z (S) $0

1910.119 D03 I E

Deleted Serious Gravity 10 1 instance 2 exposed
Issued
Mar 10, 2017
Abate by
Mar 27, 2017
Penalty
Initial $12,675 · Current $0 Reduced
29 CFR 1910.119(d)(3)(i)(E): Information pertaining to the equipment in the process did not include a ventilation system design.  The employer does not ensure that process safety information pertaining to the equipment in the process includes ventilation system design.  The employer failed to ensure the ventilation system design for the compressor building was documented.  This condition exposed employees to inhalation, fire, and explosion hazards.
Recent events (3)
  • — J (S) $0
  • — C (S) $12675
  • — Z (S) $12675

1910.119 F01

Other-than-serious 4 instances 2 exposed
Issued
Mar 10, 2017
Abate by
Mar 27, 2017
Penalty
Initial $9,959 · Current $4,980 Reduced
29 CFR 1910.119(f)(1): The employer shall develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information.    The employer did not ensure that the operating procedures were written to provide instruction for safely conducting activities involved in each covered process including, but not limited to each oil drain point and procedures to guide the receipt of ammonia into the system. Operating procedures were not provided for the following specific oil drain point and for inbounding ammonia:                 a)      In the engine room oil drain located at Accumulator VS106;              b)      In the engine room oil drain located at Accumulator VS107;             c)       In the engine room oil drain located at Accumulator VS109;           d)      Guidelines for receiving anhydrous ammonia including but not limited to: receipt of ammonia into the system, verification of material received and physical connection to the system.
Recent events (3)
  • — J (O) $4979.5
  • — C (S) $9959
  • — Z (S) $9959

1910.119 J02

Deleted Serious Gravity 10 1 instance 2 exposed
Issued
Mar 10, 2017
Abate by
Mar 27, 2017
Penalty
Initial $12,675 · Current $0 Reduced
29 CFR 1910.119(j)(2): Written procedures. The employer did not establish and implement written procedures to maintain the on-going integrity of process equipment.  The employer failed to established and implemented written procedures to maintain the on-going mechanical integrity of process equipment, such as but not limited to:  a) The employer failed to ensure detailed written procedures were established and implemented for inspection and testing for ammonia detectors in machine rooms in compliance to ASHRAE 15 and IIAR 2. To identified ammonia detectors set points to alarm at 1000ppm and the appropriate TLV-TWA and second detector to alarm and actuate emergency ventilation at 1000ppm. This condition exposed employees to fire or inhalation hazards ammonia vapors.
Recent events (3)
  • — J (S) $0
  • — C (S) $12675
  • — Z (S) $12675

1910.119 J04 III

Serious Gravity 10 11 instances 2 exposed
Issued
Mar 10, 2017
Abate by
Mar 27, 2017
Penalty
Initial $12,675 · Current $12,675
29 CFR 1910.119(j)(4)(iii): The frequency of inspections and tests of process equipment was not consistent with applicable manufacturers' recommendations and good engineering practices, and more frequently if determined to be necessary by prior operating experience.   The employer did not ensure that inspections and tests of process equipment are conducted at a frequency consistent with recognized and generally accepted good engineering practices such as IIAR Bulletin 110. Annual visual inspections of un-insulated piping, insulated piping, vessels and heat exchangers and the mechanical conditions of the drives on compressors, are inspected on a quarterly schedule were not performed in accordance with IIAR Bulletin 110. Equipment includes but is not limited to the following:    a)      CPR Pressure Supply line from High pressure Receiver to Control Pressure Receiver VS-102.    b)      Line Recirculated from CPR VS102 to Ice Machine IM101    c)      Line from IM101 to Accumulator VS107   d)      Line from Accumulator VS107 to Compressor RC106D.   e)      Compressor, RC-104   f)       Compressor, RC-106   g)      Compressor, RC-107   h)      Pump 4   i)       Re-circulator/ Control Pressure Receiver, VS102   j)      High Pressure Receiver, VS-101   k)      North Evaporative Condenser, EC-101
Recent events (3)
  • — J (S) $12675
  • — C (S) $12675
  • — Z (S) $12675

1910.119 N

Other-than-serious 2 instances 2 exposed
Issued
Mar 10, 2017
Abate by
Mar 27, 2017
Penalty
Initial $9,959 · Current $4,980 Reduced
29 CFR 1910.119(n): The employer did not establish and implement an emergency plan for the entire plant in accordance with the provisions of 29 CFR 1910.38     Throughout the facility, employer did not:     a) did not ensure that employees recognized the difference between small and large releases for highly hazardous chemicals.     b) did not review the emergency evacuation procedures with visitors and non-employees.
Recent events (3)
  • — J (O) $4979.5
  • — C (S) $9959
  • — Z (S) $9959

1910.303 G01 II

Other-than-serious 5 instances 2 exposed
Issued
Mar 10, 2017
Abate by
Mar 27, 2017
Penalty
Initial $5,975 · Current $2,988 Reduced
29 CFR 1910.303(g)(1)(ii): The required working space about electrical equipment rated 600 volts, nominal, or less to ground, was in a passageway or general open space and was not suitably guarded when normally enclosed live parts were exposed for inspection or servicing:    The employer does not ensure that the working space around electrical equipment is used for storage. The storage of materials, such as but not limited to, mop bucket, pipes pieces, industrial fans, boxes and ladders adjacent to the electrical panels, inside the engine room in the following electrical panels:     1. Panel Boards inside the engine room marked as #2 (High Voltage 480V)    2. Panel Boards inside the engine room marked as #3 (High Voltage 480V)    3. Panel Boards inside the engine room marked as #4 (High Voltage 480V)    4. Panel Boards inside the engine room marked as #7 (High Voltage 480V)    5. Panel Board marked as Power supply from panel No. 3 (Inlet Water Pump had hammer in ON position.)
Recent events (3)
  • — J (O) $2987.5
  • — C (S) $5975
  • — Z (S) $5975

View Arctic Glacier USA, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341768901.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.