OSHA Inspection: AVID PALLET SERVICES, LLC

Follow-up inspection · Health discipline

On , OSHA opened a follow-up health inspection of AVID PALLET SERVICES, LLC in 1401 EDDY AVENUE, BELOIT, WI 53511 (NAICS 321920). OSHA activity number 341772291.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Avid Pallet Services, LLC — free Get an email when a new federal OSHA severe-injury report for Avid Pallet Services, LLC is published. One employer, no account, unsubscribe in one click.
Site address
1401 EDDY AVENUE
City
BELOIT
State
WI
ZIP
53511
Mailing
1401 EDDY AVENUE, BELOIT, WI 53511
Inspection type
Follow-up (F)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
321920
Employees
88
Ownership type
A

4 citations on file for this inspection.

1910.134 A02

Serious Gravity 10 1 instance 1 exposed
Issued
Dec 28, 2016
Abate by
Mar 27, 2017
Penalty
Initial $19,205 · Current $10,000 Reduced

Hazardous substances 9135W103

29 CFR 1910.134(a)(2): The employer did not establish and maintain a respiratory protection program which included the requirements outlined in 29 CFR 1910.134(c):    On or about September 28, 2016 employee was cutting wood with a horizontal band saw and was exposed to particulates not otherwise regulated (PNOR) exceeding 15.0 milligrams/cubic meter, as an 8 hour time weighted average, without wearing respiratory protection.      One band saw employee was exposed to 22.67 milligrams/cubic meter of PNOR, as an 8 hour time weighted average.  The employee was sampled on September 28, 2016 for 452 minutes, the remaining 28 minutes were calculated as 0 (zero) exposure time.
Recent events (2)
  • — I (S) $10000
  • — Z (R) $19205

1910.1000 A02

Serious Gravity 10 1 instance 1 exposed
Issued
Dec 28, 2016
Abate by
Mar 27, 2017
Penalty
Initial $0 · Current $0

Hazardous substances 9135W103

29 CFR 1910.1000(a)(2): Employee(s) were exposed to an airborne concentration of Particles Not Otherwise Regulated listed in Table Z-1 in excess of the 8 hour Time Weighted Average concentration of 15.0 mg/m3:     On or about September 28, 2016 employee was cutting wood with a horizontal band saw and was exposed to particulates not otherwise regulated (PNOR) exceeding 15.0 milligrams/cubic meter, as an 8 hour time weighted average, without wearing respiratory protection.      One band saw employee was exposed to 22.67 milligrams/cubic meter of PNOR, as an 8 hour time weighted average.  The employee was sampled on September 28, 2016 for 452 minutes, the remaining 28 minutes were calculated as 0 (zero) exposure time.
Recent events (2)
  • — I (S) $0
  • — Z (R) $0

1910.1000 E

Serious Gravity 10 1 instance 1 exposed
Issued
Dec 28, 2016
Abate by
Apr 28, 2017
Penalty
Initial $0 · Current $0

Hazardous substances 9135W103

29 CFR 1910.1000(e): Feasible administrative or engineering controls were not determined and implemented to achieve compliance with the limits prescribed in 29 CFR 1910.1000(a) through (d):     On or about September 28, 2016 employee was cutting wood with a horizontal band saw and was exposed to particulates not otherwise regulated (PNOR) exceeding 15.0 milligrams/cubic meter, as an 8 hour time weighted average, without wearing respiratory protection.      One band saw employee was exposed to 22.67 milligrams/cubic meter of PNOR, as an 8 hour time weighted average.  The employee was sampled on September 28, 2016 for 452 minutes, the remaining 28 minutes were calculated as 0 (zero) exposure time.     Abatement normally will be multistep as follows:   STEP 1:  Effective respiratory protection shall be provide and used by exposed employees as an interim protective measure until feasible engineering and/or administrative controls can be implemented, or whenever such controls fail to reduce employee exposure to within exposure limits.       Abatement due 30 days from issuance date:    STEP 2:  Submit to the Area Director a written detailed plan of abatement outlining a schedule for the implementation of engineering and /or administrative measures to control employee exposure to hazardous substance as referenced in this Citation.  This plan shall include, at a minimum, target dates for the following actions which must be consistent with the abatement dates required by this Citation:    1.  Evaluation of engineering/administrative control options;    2.  Selection of optimum control methods and completion of design;    3.  Procurement, installation, and operation of selected control measures; and    4.  Testing and acceptable or modification/redesign of controls.    All proposed control measures shall be approved for each particular use by a competent industrial hygienist or other technically qualified person.    Abatement due 60 days from issuance date:    Step 3:  Abatement shall have been completed by the implementation of feasible engineering and/or administrative controls upon verification of their effectiveness in achieving compliance.   Abatement due 90 days from issuance date:
Recent events (2)
  • — I (S) $0
  • — Z (R) $0

1910.134 C

Serious Gravity 10 1 instance 1 exposed
Issued
Dec 28, 2016
Abate by
Mar 27, 2017
Penalty
Initial $19,205 · Current $0 Reduced

Hazardous substances 9135W103

29 CFR 1910.134(c): The employer did not develop and implement a written respiratory protection program with required worksite-specific procedures and elements for required respirator use:    On or about September 28, 2016 employee was cutting wood with a horizontal band saw and was exposed to particulates not otherwise regulated (PNOR) exceeding 15.0 milligrams/cubic meter, as an 8 hour time weighted average, without wearing respiratory protection.      One band saw employee was exposed to 22.67 milligrams/cubic meter of PNOR, as an 8 hour time weighted average.  The employee was sampled on September 28, 2016 for 452 minutes, the remaining 28 minutes were calculated as 0 (zero) exposure time.
Recent events (2)
  • — I (S) $0
  • — Z (R) $19205

View Avid Pallet Services, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341772291.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.