Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: QUICK BRICK MASONRY INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of QUICK BRICK MASONRY INC. in 900 LEE ST., DES PLAINES, IL 60016 (NAICS 238140). OSHA activity number 341817948.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Quick Brick Masonry INC. — free Get an email when a new federal OSHA severe-injury report for Quick Brick Masonry INC. is published. One employer, no account, unsubscribe in one click.
Site address
900 LEE ST.
City
DES PLAINES
State
IL
ZIP
60016
Mailing
2 N 115 CLARENDON AVE., LOMBARD, IL 60148
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
4
Ownership type
A

8 citations on file for this inspection.

1926.100 A

Serious Gravity 5 1 instance 1 exposed
Issued
Feb 16, 2017
Abate by
Feb 23, 2017
Penalty
Initial $2,173 · Current $1,149 Reduced
29 CFR 1926.100(a):  Employees were not protected by protective helmets while working in areas where there was a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns:       a) On October 4, 2016, employees were not wearing protective helmets where there was a possible danger of head injury.       In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1149
  • — Z (S) $2173

1926.451 D16

Serious Gravity 5 1 instance 1 exposed
Issued
Feb 16, 2017
Abate by
Feb 23, 2017
Penalty
Initial $2,173 · Current $2,173
29 CFR 1926.451(d)(16): The suspension scaffold power-operated hoist or manually operated hoist did not have, in addition to the normal operating brake, a braking device or locking pawl which engages automatically when a hoist makes either of the following uncontrolled movements: an instantaneous change in momentum or an accelerated overspeed.     a)  On October 4, 2016, employees were working from a two-point adjustable suspension scaffold which did not have a breaking device or locking pawl.      In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $2173
  • — Z (S) $2173

1926.451 D17

Serious Gravity 5 1 instance 1 exposed
Issued
Feb 16, 2017
Abate by
Feb 23, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.451(d)(17):  Manually operated hoists did not have a positive crank force to descend:     a)  On October 4, 2016, employees were working from a two-point adjustable suspension scaffold where the manually operated hoist did not have a positive crank force to descend.     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 D05 II

Serious Gravity 5 1 instance 1 exposed
Issued
Feb 16, 2017
Abate by
Feb 23, 2017
Penalty
Initial $2,173 · Current $0 Reduced
29 CFR 1926.451(d)(5)(ii): Suspension scaffold support devices such as cornice hooks, roof hooks, roof irons, parapet clamps, or similar devices were not supported by bearing blocks:      a)  On October 4, 2016, employees were exposed to the hazard of falling while working from a two-point adjustable suspension scaffold platform, supported by the parapet hooks without the use of bearing blocks.       In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $0
  • — Z (S) $2173

1926.451 E01

Serious Gravity 5 1 instance 1 exposed
Issued
Feb 16, 2017
Abate by
Feb 23, 2017
Penalty
Initial $2,173 · Current $2,173
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used:      a)  On October 4, 2016, employees were not provided with safe access to a two-point adjustable suspension scaffold platform being used at an elevation of approximately 40 feet above the ground.     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $2173
  • — Z (S) $2173

1926.1051 A

Serious Gravity 1 1 instance 1 exposed
Issued
Feb 16, 2017
Abate by
Feb 23, 2017
Penalty
Initial $1,630 · Current $0 Reduced
29 CFR 1926.1051(a): Stairway(s) or ladder(s) were not provided at all personnel points of access where there was a break in elevation of 19 inches (48 cm) or more, or no ramp, runway, sloped embankment, or personnel hoist was provided:    a)  On October 4, 2016, employees were not provided with a safe point of access where there was a break in elevation of 26 inches between the roof-top and the top of the parapet wall.        In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $0
  • — Z (S) $1630

1926.451 G03 I

Serious Gravity 5 1 instance 1 exposed
Issued
Feb 16, 2017
Abate by
Feb 23, 2017
Penalty
Initial $2,173 · Current $2,173
29 CFR 1926.451(g)(3)(i): Vertical lifelines were not fastened to a fixed safe point of anchorage, independent of the scaffold, and protected from sharp edges and abrasion:         a)  On October 4, 2016, vertical lifelines that were used by employees working from two-point adjustable suspension scaffold were not protected from abrasion and sharp edges of the parapet wall.         In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $2173
  • — Z (S) $2173

1926.451 G04 III

Serious Gravity 5 1 instance 1 exposed
Issued
Feb 16, 2017
Abate by
Feb 23, 2017
Penalty
Initial $2,173 · Current $0 Reduced
29 CFR 1926.451(g)(4)(iii): Midrails, screens, mesh or equivalent structural members shall be installed between the top edge of the guardrail system and the scaffold platform:       a)  On October 4, 2016, employees were working from a two-point suspension scaffold platform without the midrail installed between the top edge of the guardrail system and the scaffold platform.        In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $0
  • — Z (S) $2173

View Quick Brick Masonry INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341817948.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.