OSHA Inspection: MERIT ERECTORS, INC

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of MERIT ERECTORS, INC in 4101 BACH-BUXTON ROAD, BATAVIA, OH 45103 (NAICS 238120). OSHA activity number 341837169.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Merit Erectors, INC — free Get an email when a new federal OSHA severe-injury report for Merit Erectors, INC is published. One employer, no account, unsubscribe in one click.
Establishment
MERIT ERECTORS, INC
Site address
4101 BACH-BUXTON ROAD
City
BATAVIA
State
OH
ZIP
45103
Mailing
1046 DELTA AVE., #5, CINCINNATI, OH 45208
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238120
Employees
40
Ownership type
A

6 citations on file for this inspection.

1926.20 B02

Serious Gravity 10 4 instances 4 exposed
Issued
Feb 7, 2017
Abate by
Feb 13, 2017
Penalty
Initial $8,873 · Current $8,873
29 CFR 1926.20(b)(2): The employer did not initiate and maintain programs which provide for frequent and regular inspections of the job sites, materials, and equipment to be made by competent persons designated by the employers.     Located within Sequence 17 Music Wing on October 10 and/or 11, 2016 Table A type short span open web steel bar joist series 22K7-J240 and 22K9-J237 both exceeding 40 foot 7 inches span were erected with crane supported load lines releasing joist load prior to being welded on both sides of the seat of one end of each steel joist and bolted diagonal erection bridging being installed and anchored without the competent person maintaining performance of inspections on bar joist series type and spans based on Table A of 1926.757 and Partial Roof Joist Erection Plan J2.21 to determine and ensure during the erection, attachment open web steel joist required open web steel bar joist seat welding and bolted erection bridging connections were in place prior to release of load lines.
Recent events (2)
  • — I (S) $8873
  • — Z (S) $8873

1926.757 A06

Serious Gravity 10 4 instances 4 exposed
Issued
Feb 7, 2017
Abate by
Feb 13, 2017
Penalty
Initial $8,873 · Current $0 Reduced
29 CFR 1926.757(a)(6): When steel joist(s) are landed on a structure, they shall be secured to prevent unintentional displacement prior to installation.     Located within Sequence 17 Music Wing on October 10 and/or 11, 2016 prior to installation at final erection connection points Table A type short span open web steel bar joist series 22K7-J240 and 22K9-J237 both exceeding 40 foot 7 inches span were landed on the joist pocket structure with crane supported load lines releasing joist load prior to being welded on both sides of the seat of one end of each steel joist exposing employees to the hazard of being struck by unintentional joist displacement from the joist pocket bearing points.
Recent events (2)
  • — I (S) $0
  • — Z (S) $8873

1926.757 C01

Serious Gravity 10 4 instances 4 exposed
Issued
Feb 7, 2017
Abate by
Feb 13, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.757(c)(1): Both sides of the seat of one end of each steel joist that requires bridging under Tables A and B shall be attached to the support structure before hoisting cables are released.     Located within Sequence 17 Music Wing on October 10 and/or 11, 2016 at final erection connection points Table A type short span open web steel bar joist series 22K7-J240 and 22K9-J237 both exceeding 40 foot 7 inches span were landed on the joist pocket structure with crane supported load lines releasing joist load prior to being welded on both sides of the seat of one end of each steel joist as required in Table A of 1926.757 exposing employees to the hazard of being struck by unintentional joist displacement from the joist pocket bearing points
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.757 D01 II

Serious Gravity 10 4 instances 4 exposed
Issued
Feb 7, 2017
Abate by
Feb 13, 2017
Penalty
Initial $8,873 · Current $0 Reduced
29 CFR 1926.757(d)(1)(ii): Where the span of the steel joist is equal to or greater than the span shown in Tables A and B hoisting cables shall not be released until this bolted diagonal erection bridging is installed and anchored.     Located within Sequence 17 Music Wing on October 10 and/or 11, 2016 Table A type short span open web steel bar joist series 22K7-J240 and 22K9-J237 both exceeding 40 foot 7 inches span were landed on the joist pocket structure with crane supported load lines releasing joist load prior to bolted diagonal erection bridging being installed and anchored as required in Table A of 1926.757 exposing employees to the hazard of being struck by unintentional joist displacement from the joist pocket bearing points.
Recent events (2)
  • — I (S) $0
  • — Z (S) $8873

1926.757 E01

Serious Gravity 10 2 instances 2 exposed
Issued
Feb 7, 2017
Abate by
Feb 13, 2017
Penalty
Initial $8,873 · Current $4,427 Reduced
29 CFR 1926.757(e)(1): During the construction period, the employer placing a load on steel joists shall ensure that the load is distributed so as not to exceed the carrying capacity of any steel joist.     Located within Sequence 17 Music Wing on October 11, 2016 during the construction period the employer allowed metal decking construction load bundle(s) distribution to be placed on 1926.757 Table A covered type short span open web steel bar joist series 22K7-J240 exceeding 40 foot 7 inches spans were erected without ensuring all erection and horizontal bridging had been installed and anchored and all joist-bearing ends secured with welded attachment anchorage exposing employees to the hazard of being struck by unintentional displacement of open web steel joist which exceeded the carrying capacity of the steel joist within pocketed bearing points.
Recent events (2)
  • — I (S) $4427
  • — Z (S) $8873

1926.757 E02

Serious Gravity 10 2 instances 2 exposed
Issued
Feb 7, 2017
Abate by
Feb 13, 2017
Penalty
Initial $8,873 · Current $0 Reduced
29 CFR 1926.757(e)(2): Except for paragraph (e)(4) of this section, no construction loads are allowed on the steel joists until all bridging is installed and anchored and all joist-bearing ends are attached.     Located within Sequence 17 Music Wing on October 11, 2016 metal decking construction load bundle(s) were allowed to be placed on 1926.757 Table A covered type short span open web steel bar joist series 22K7-J240 exceeding 40 foot 7 inches spans were erected without all erection and horizontal bridging being installed and anchored and all joist-bearing ends secured with welded attachment anchorage exposing employees to the hazard of being struck by unintentional displacement of open web steel joist which exceeded the carrying capacity of the steel joist within pocketed bearing points.
Recent events (2)
  • — I (S) $0
  • — Z (S) $8873

View Merit Erectors, INC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341837169.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.