LYON STATION, PA —
OSHA Inspection: B. J. BALDWIN ELECTRIC INC.
Federal Agency inspection · Safety discipline
At a glance
On , OSHA opened a federal Agency safety inspection of B. J. BALDWIN ELECTRIC INC. in 102 DEKA ROAD, LYON STATION, PA 19536 (NAICS 238210). OSHA activity number 341855260.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- B. J. BALDWIN ELECTRIC INC.
- Site address
- 102 DEKA ROAD
- City
- LYON STATION
- State
- PA
- ZIP
- 19536
- Mailing
- 7060 DIVISION HIGHWAY, NARVON, PA 17555
What kind of inspection was it?
- Inspection type
- Federal Agency (M)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238210
- Employees
- 50
- Ownership type
- A
Citations
4 citations on file for this inspection.
1910.333 B02 IV B
- Issued
- Mar 9, 2017
- Abate by
- Apr 4, 2017
- Penalty
- Initial $12,675 · Current $12,675
General-duty citation text
29 CFR 1910.333(b)(2)(iv)(B): Before circuits or equipment was worked as deenergized, a qualified person did not use test equipment to test the circuit elements and electrical parts of equipment to which employees would be exposed and did not verify that the circuit elements and electrical parts were deenergized: a) Building I2, Mezzanine Level; Switchgear S&T - On or about October 19, 2016 and times prior thereto, the employer did not ensure that a qualified person tested, by use of a test instrument, that the load side of the electrical circuit in cabinet #4 was verified as being in a deenergized state. Employees were exposed to electrocution hazards while working on and near exposed bus bars of the 480 volt energized switchgear. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $12675
- — Z (S) $12675
1926.403 B02
- Issued
- Mar 9, 2017
- Abate by
- Apr 4, 2017
- Penalty
- Initial $12,675 · Current $0 Reduced
General-duty citation text
29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification: a) Building I2, Mezzanine Level; Switchgear S&T - On or about October 19, 2016 and times prior thereto, a distribution feeder was used as a tie circuit breaker within a double-ended substation. Employees were exposed to electrocution hazards while working in switchgear S&T. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $12675
1926.416 A03
- Issued
- Mar 9, 2017
- Abate by
- Apr 4, 2017
- Penalty
- Initial $12,675 · Current $12,675
General-duty citation text
29 CFR 1926.416(a)(3): Before work began the employer did not ascertain by inquiry, direct observation, or by instruments, whether any part of an energized electric power circuit, exposed or concealed, was so located that the performance of the work could bring any person, tool, or machine into physical or electrical contact with the electric power circuit. Nor did the employer post and maintain proper warning signs and advise employee(s) of the power circuit as required: a) Building I2, Mezzanine Level; Switchgear S&T - On or about October 19, 2016 and times prior thereto, substation S side of the 480 volt switchgear was energized and the employer failed to assess the substation T side of the switchgear to determine if exposed bus bars were energized. Employees working on and near the substation T side of the switchgear were exposed to electrocution hazards. b) Building I2, Mezzanine Level; Switchgear S&T - On or about October 19, 2016 and times prior thereto, the employer failed to post and maintain proper warning signs and instruct each employee in the recognition and avoidance of unsafe conditions while working on and near the partially complete and energized switchgear exposing the employees to electrocution hazards. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $12675
- — Z (S) $12675
1926.20 B02
- Issued
- Mar 9, 2017
- Abate by
- Apr 4, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.20(b)(2): The employer did not initiate and maintain programs which provided for frequent and regular inspections of the job site, materials and equipment to be made by a competent person(s): a) Building I2, Mezzanine Level; Switchgear S&T - On or about October 19, 2016 and times prior thereto, a competent person did not inspect the installed switchgear prior to or after energization, exposing employees to electrocution hazards. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at B. J. Baldwin Electric INC.
View B. J. Baldwin Electric INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238210)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341855260.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.