Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: PERFORMANCE CONTRACTORS, INC.

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of PERFORMANCE CONTRACTORS, INC. in 5900 HWT 225, DEER PARK, TX 77536 (NAICS 237990). OSHA activity number 341860971.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Performance Contractors, INC. — free Get an email when a new federal OSHA severe-injury report for Performance Contractors, INC. is published. One employer, no account, unsubscribe in one click.
Site address
5900 HWT 225
City
DEER PARK
State
TX
ZIP
77536
Mailing
9901 PECUE LANE, BATON ROUGE, LA 70810
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237990
Employees
8000
Ownership type
A

3 citations on file for this inspection.

1926.251 D06

Other-than-serious 1 instance 2 exposed
Issued
Jan 18, 2017
Abate by
Feb 6, 2017
Penalty
Initial $12,675 · Current $12,675
29 CFR 1926.251(d)(6): Natural and synthetic fiber rope slings were not immediately removed from service when any of the following conditions specified in 1926.251(d)(6)(i) through (d)(6)(vi) were present:         At the Shell Deer Park Site, the employer did not remove synthetic web rope slings (Polyester) serial number 1079286-40 from service, exposing employees to struck by hazards.
Recent events (2)
  • — I (O) $12675
  • — Z (S) $12675

1926.1404 D01 I

Serious Gravity 10 1 instance 3 exposed
Issued
Jan 18, 2017
Abate by
Feb 6, 2017
Penalty
Initial $12,675 · Current $12,675
29 CFR 1926.1404(d)(1)(i): 29 CFR 1926.1404(d)(1)(i)Before commencing assembly/disassembly operations, the A/D director did not ensure that the crew members understood all of their tasks.        At the Shell Deer Park Site, the employer did not ensure crew members understood all their task, exposing employees to struck by hazards.
Recent events (2)
  • — I (S) $12675
  • — Z (S) $12675

1926.1404 F01

Serious Gravity 10 1 instance 1 exposed
Issued
Jan 18, 2017
Abate by
Feb 6, 2017
Penalty
Initial $12,675 · Current $0 Reduced
29 CFR 1926.1404(f)(1): When pins (or similar devices) are being removed, employees were under the boom, jib, or other components, except where the requirements of paragraph (f)(2) of this section are met.        At the shell deer park, employer allowed employees to remove the stow pins while under the boom, exposing employees to struck by Hazards.
Recent events (2)
  • — I (S) $0
  • — Z (S) $12675

View Performance Contractors, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341860971.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.