BOYCEVILLE, WI —
OSHA Inspection: BIG RIVER RESOURCES, LLC.
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of BIG RIVER RESOURCES, LLC. in N10185 370TH STREET, BOYCEVILLE, WI 54725 (NAICS 325193). OSHA activity number 341883973.
Where did this inspection happen?
- Establishment
- BIG RIVER RESOURCES, LLC.
- Site address
- N10185 370TH STREET
- City
- BOYCEVILLE
- State
- WI
- ZIP
- 54725
- Mailing
- N10185 370TH STREET, BOYCEVILLE, WI 54725
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 325193
- Employees
- 37
- Ownership type
- A
Citations
5 citations on file for this inspection.
1910.119 D03 I B
- Issued
- Abate by
- Penalty
- Initial $4089.00 · Current $2862.00 Reduced
General-duty citation text
29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams (P&IDs) were not accurate and did not represent equipment that was existing and was part of the process: (a) Distillation/Evaporation Rectifier P&ID E245-0704-500; The P&IDs were not accurate and did not represent the fusel line from the TP-4501 Rectifier Column (PD-4505 Fusel Draw Pump) to the TP-4611 200 Proof Flash Vessel (PC-4611 200 Proof Product Pump). (b) Distillation/Evaporation Molecular Sieves P&ID E245-0704-600; The P&IDs were not accurate and did not represent the fusel line from the TP-4501 Rectifier Column (PD-4505 Fusel Draw Pump) to the TP-4611 200 Proof Flash Vessel (PC-4611 200 Proof Product Pump).
Recent events (2)
- — I (S) $2862.3
- — Z (S) $4089
1910.119 L04
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.119(l)(4): Process safety information required by paragraph (d) of this section was not updated when a change covered by this paragraph resulted in a change in the process safety information: (a) Distillation; A Management of Change was not implemented and documented for the addition of a fusel line from the TP-4501 Rectifier Column (PD-4505 Fusel Draw Pump) to the TP-4611 200 Proof Flash Vessel (PC-4611 200 Proof Product Pump). (b) Distillation; A Management of Change was not implemented and documented for the extended lockout of a line on the EP-4611 Sieve Feed Economizer.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C05 II
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(5)(ii): Lockout devices and tagout devices were not used for lockout and tagout purposes only: (a) Distillation; Lockout devices were utilized for purposes other than controlling energy, a lockout device was utilized for an extended period of time to lock out the fusel line from the TP-4501 Rectifier Column (PD-4505 Fusel Draw Pump) to the TP-4611 200 Proof Flash Vessel (PC-4611 200 Proof Product Pump). (b) Distillation; Lockout devices were utilized for purposes other than controlling energy, a lockout device was utilized for an extended period of time to lock out a line on the EP-4611 Sieve Feed Economizer.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.119 J06 II
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.119(j)(6)(ii): Appropriate checks and inspections were not performed to assure that equipment was installed properly and consistent with design specifications and the manufacturer's instructions: (a) Distillation, Sieve Bottle #1 (TP- 4601); Pressure Indicator (PI4602B) was missing. (b) Distillation, Sieve Bottle #3 (TP4603); Pressure Indicator (PI4606B) was missing.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.147 C06 I C
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(6)(i)(C): Where lockout was used for energy control, the periodic inspection did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected: (a) Throughout the facility; The periodic inspection did not include a review between the inspector, the authorized employee(s), and the energy control procedure.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at BIG RIVER RESOURCES, LLC.
JOY, IL—2017-09-18 00:00:00
BIG RIVER RESOURCES, LLC
WEST BURLINGTON, IA—2007-08-01 00:00:00
BIG RIVER RESOURCES, LLC
View BIG RIVER RESOURCES, LLC.'s full OSHA safety record →
More inspections in this industry (NAICS 325193)
SOUTH BEND, IN—2026-07-15 00:00:00
VERBIO - SOUTH BEND ETHANOL
GREENVILLE, OH—2026-06-25 00:00:00
THE ANDERSONS RENEWABLES LLC
FORT DODGE, IA—2026-06-23 00:00:00
A09CS000010FBESAAK - VALERO RENEWABLE FUELS COMANY, LLC
VAN NUYS, CA—2026-05-08 00:00:00
ANHEUSER-BUSCH, LLC
MADRID, NE—2026-04-29 00:00:00
MID AMERICA AGRI PRODUCTS
More inspections in WI
GREEN BAY, WI—2026-07-17 00:00:00
PTS CONTRACTORS, INC.
WAUSAU, WI—2026-07-16 00:00:00
MIRON CONSTRUCTION CO. INC.
ELROY, WI—2026-07-15 00:00:00
WABASH NATIONAL SERVICES, L.P.
SUSSEX, WI—2026-07-15 00:00:00
KINGS SUPERIOR CONSTRUCTION LLC
DELAVAN, WI—2026-07-15 00:00:00
TERONOMY BUILDERS, INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341883973.