OSHA Inspection: FAIRLEY CONSTRUCTION

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of FAIRLEY CONSTRUCTION in 1272 EVELYN GANDY PARKWAY, PETAL, MS 39465 (NAICS 238130). OSHA activity number 341915247.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Fairley Construction — free Get an email when a new federal OSHA severe-injury report for Fairley Construction is published. One employer, no account, unsubscribe in one click.
Site address
1272 EVELYN GANDY PARKWAY
City
PETAL
State
MS
ZIP
39465
Mailing
828 HIGHWAY 11, PETAL, MS 39465
Inspection type
Complaint (B)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
20
Ownership type
A

5 citations on file for this inspection.

1926.404 B01 II

Serious Gravity 10 1 instance 5 exposed
Issued
Jan 5, 2017
Abate by
Jan 9, 2017
Penalty
Initial $4,490 · Current $1,796 Reduced
29 CFR 1926.404(b)(1)(ii): On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupers for personal protection.    (a) Rear of building - on or about November 15, 2016 workers building the commercial building were using receptacles to power their equipment and tools that was supplied by the contractor that were not protected by a ground fault circuit interrupter.
Recent events (2)
  • — I (S) $1796
  • — Z (S) $4490

1926.405 A02 II A

Serious Gravity 5 2 instances 5 exposed
Issued
Jan 5, 2017
Abate by
Jan 9, 2017
Penalty
Initial $2,181 · Current $1,419 Reduced
29 CFR 1926.405(a)(2)(ii)(A): Temporary wiring feeder conductors were not run as multiconductor cord or cable assemblies or within raceways; or, where not subject to physical damage, run as open conductors on insulators not more than 10 feet apart:    (a) South side of building - On or about November 15, 2016 the employer had placed the temporary electrical power to the exterior lights and outlets on the driveway where vehicle traffic must pass multiple times a day with no protection from physical damage or environmental damage.
Recent events (2)
  • — I (S) $1418.5
  • — Z (S) $2181

1926.405 B01

Serious Gravity 5 1 instance 5 exposed
Issued
Jan 5, 2017
Abate by
Jan 9, 2017
Penalty
Initial $2,726 · Current $1,771 Reduced
29 CFR 1926.405(b)(1): Unused openings in cabinets, boxes, and fittings were not effectively closed:    (a) Rear of building - On or about November 15, 2016 employees using electrical power from panel box on pole is missing two blank cover plates on panel buss bar exposing live wires inside.
Recent events (2)
  • — I (S) $1770.5
  • — Z (S) $2726

1926.405 E01

Serious Gravity 1 2 instances 5 exposed
Issued
Jan 5, 2017
Abate by
Jan 9, 2017
Penalty
Initial $1,636 · Current $981 Reduced
29 CFR 1926.405(e)(1): Cabinets, cutout boxes, fittings, boxes, and panelboard enclosures in damp or wet locations were not installed so as to prevent moisture or water from entering and accumulating within the enclosures:    (a) Bach of building - On or about November 15, 2016 employees are plugging their extension cords into an job made outlet box that is not weather proof and the parking lot lights wiring is spliced in a ceiling round junction box that is not weather proof.
Recent events (2)
  • — I (S) $980.5
  • — Z (S) $1636

1926.405 G02 III

Serious Gravity 10 1 instance 5 exposed
Issued
Jan 5, 2017
Abate by
Jan 9, 2017
Penalty
Initial $4,490 · Current $1,796 Reduced
29 CFR 1926.405(g)(2)(iii): The repair splice in a hard service flexible cord No. 12 or larger did not retain the insulation, outer sheath properties, and usage characteristics of the cord which was being used:    (a) Rear of building - On or about November 15, 2016 employees were using an electrical extension that was hard wired into the panel box that has two splices that did not retain the insulation factor of the outer sheathing properties.
Recent events (2)
  • — I (S) $1796
  • — Z (S) $4490