Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: MUNICIPAL HYDRO SERVICES, INC.

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of MUNICIPAL HYDRO SERVICES, INC. in VACINITY OF 150 E FLEMMING RD, MONTGOMERY, AL 36105 (NAICS 237110). OSHA activity number 341954212.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Municipal Hydro Services, INC. — free Get an email when a new federal OSHA severe-injury report for Municipal Hydro Services, INC. is published. One employer, no account, unsubscribe in one click.
Site address
VACINITY OF 150 E FLEMMING RD
City
MONTGOMERY
State
AL
ZIP
36105
Mailing
92 KILGORE RD., CARROLLTON, GA 30116
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237110
Employees
30
Ownership type
A

2 citations on file for this inspection.

1926.602 D

Serious Gravity 5 1 instance 2 exposed
Issued
Jan 18, 2017
Abate by
Feb 13, 2017
Penalty
Initial $5,070 · Current $3,000 Reduced
29 CFR 1926.602(d): The employer did not certify that each operator had been trained and evaluated as required by paragraph 29 CFR 1910.178(l):   In reference to the following standard  29 CFR 1910.178(l)(1)(i): The employer did not ensure that each powered industrial truck operator is competent to operate a powered industrial truck safely, as demonstrated by the successful completion of the training and evaluation specified in this paragraph (l):  a)  At Montgomery Phase 1 Sewage Project, Montgomery, Alabama:  On or about December 6, 2016 and at times prior; the employer exposed his employees to struck-by hazards in that employees were allowed to operate a JLG Lull on site without the employer first ensuring the employee was competent to operate the equipment as demonstrated by the completion of the required training and evaluation specified in the regulation.
Recent events (2)
  • — I (S) $3000
  • — Z (S) $5070

1926.251 B01

Other-than-serious 1 instance 2 exposed
Issued
Jan 18, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.251(b)(1): Welded alloy steel chain sling(s) did not have permanently affixed durable identification stating size, grade, rated capacity, and sling manufacturer:  a)  At Montgomery Phase 1 Sewage Project, Montgomery, Alabama:  On or about December 6, 2016 and at times prior;  the employer failed to ensure a alloy steel chain used on site to drag sewage pipe hade a tag installed listing its rated capacity, size, grade and sling manufacturer.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341954212.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.