OSHA Inspection: SLI FRAMING

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of SLI FRAMING in 6130 LAGO MAR BLVD CATALON AT LAGO MAR APTS, TEXAS CITY, TX 77592 (NAICS 238130). OSHA activity number 341959997.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch SLI Framing — free Get an email when a new federal OSHA severe-injury report for SLI Framing is published. One employer, no account, unsubscribe in one click.
Establishment
SLI FRAMING
Site address
6130 LAGO MAR BLVD CATALON AT LAGO MAR APTS
City
TEXAS CITY
State
TX
ZIP
77592
Mailing
1500 MARINA BAY DRIVE #3555, KEMAH, TX 77565
Inspection type
Unprogrammed Other (I)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
6
Ownership type
A

6 citations on file for this inspection.

1926.451 F07

Serious Gravity 5 1 instance 2 exposed
Issued
Mar 28, 2017
Abate by
Apr 10, 2017
Penalty
Initial $5,577 · Current $3,346 Reduced
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:  a)  At the Catalon Project, building 4: the Werner PJ-100 pump jack scaffold was not erected under the supervision and direction of a competent person qualified in scaffold erection, exposing employees to a fall hazard.
Recent events (2)
  • — I (S) $3346.2
  • — Z (S) $5577

1926.451 B05 II

Serious Gravity 5 1 instance 2 exposed
Issued
Mar 28, 2017
Abate by
Apr 10, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.451(b)(5)(ii): The end of a platform greater than 10 feet in length extended over its support more than 18 inches and the platform was not designed and installed so that the cantilevered portion of the platform was able to support employees without tipping, or had guardrails which blocked employee access to the cantilivered end:   a)  At the Catalon Project, Building 4: the Werner PJ-100 scaffold platform extended more than 18 inches beyond the supports, exposing employees to a fall hazard.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 C02

Serious Gravity 5 1 instance 2 exposed
Issued
Mar 28, 2017
Abate by
Apr 10, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation:   a)  At the Catalon Project, Building 4: the Werner PJ-100 pump jack scaffold vertical poles were missing pole feet or equivalent base plates, exposing employees to a fall hazard.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G03 IV

Serious Gravity 5 1 instance 2 exposed
Issued
Mar 28, 2017
Abate by
Apr 10, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(3)(iv): Vertical lifelines were attached to or used the same point of anchorage:  a)  At the Catalon Project, building 4: two employees working on a Werner pump jack scaffold were using vertical lifelines attached to the same roof anchor, exposing employees to a fall hazard.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.452 J02

Serious Gravity 5 1 instance 2 exposed
Issued
Mar 28, 2017
Abate by
Apr 10, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.452(j)(2): Poles were not secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary.  a)  At the Catalon Project, building 4: the Werner PJ-100 pump jack scaffold did not have bottom and intermediate bracing, exposing employees to a fall hazard.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1904.40 A

Other-than-serious 2 instances 6 exposed
Issued
Mar 28, 2017
Abate by
Apr 10, 2017
Penalty
Initial $1,394 · Current $836 Reduced
29 CFR 1904.40(a): The employer did not provide an authorized government representative copies of requested records kept under Part 1904 within four (4) business hours:    a) 2016 OSHA Form 300 or equivalent, was not provided within 4 hours upon request.  b) 2015 OSHA Form 300 or equivalent, was not provided within 4 hours upon request.
Recent events (2)
  • — I (O) $836.4
  • — Z (O) $1394

View SLI Framing's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341959997.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.