BROOKVILLE, OH —
OSHA Inspection: FIBRE GLAST DEVELOPMENTS CORPORATION
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of FIBRE GLAST DEVELOPMENTS CORPORATION in 385 CARR DRIVE, BROOKVILLE, OH 45309 (NAICS 424310). OSHA activity number 341970465.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- FIBRE GLAST DEVELOPMENTS CORPORATION
- Site address
- 385 CARR DRIVE
- City
- BROOKVILLE
- State
- OH
- ZIP
- 45309
- Mailing
- 385 CARR DRIVE, BROOKVILLE, OH 45309
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 424310
- Employees
- 16
- Ownership type
- A
Citations
5 citations on file for this inspection.
1910.151 C
- Issued
- Feb 3, 2017
- Abate by
- Feb 23, 2017
- Penalty
- Initial $2,216 · Current $1,551 Reduced
General-duty citation text
29 CFR 1910.151(c): Where employees were exposed to injurious corrosive materials, suitable facilities for quick drenching or flushing of the eyes and body were not provided within the work area for immediate emergency use: a) On 12/13/2016, on the northwest side of the production area, an eyewash and shower were not provided in the work area for immediate use when employees transferred a corrosive liquid (methyl ethyl ketone peroxide). b) On 12/13/2016, in a central location of the production area, an eyewash and shower were not provided in the work area for immediate use when employees transferred corrosive liquids (Aeropoxy PH3660, PH3417, and PH3665).
Recent events (2)
- — I (S) $1551.2
- — Z (S) $2216
1910.1200 H01
- Issued
- Feb 3, 2017
- Abate by
- Feb 23, 2017
- Penalty
- Initial $2,216 · Current $1,551 Reduced
General-duty citation text
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: On or about 12/13/2016, in the production area, employees were exposed to hazardous chemicals such as methyl ethyl ketone peroxide (corrosive and flammable), styrene (flammable), and acetone (flammable) and were not provided with information and training on hazardous chemicals in their work area at the time of their initial assignment.
Recent events (2)
- — I (S) $1551.2
- — Z (S) $2216
1910.1200 H03 IV
- Issued
- Feb 3, 2017
- Abate by
- Feb 23, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(h)(3)(iv): The details of the hazard communication program developed by the employer, did not include an explanation of the labels received on shipped containers and the workplace labeling system used by their employer; the safety data sheet, including the order of information and how employee could obtain and use the appropriate hazard information: On or about 12/13/2016, at 385 Carr Drive in Brookeville, OH, the employer did not train employees on pictograms used in the workplace.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.134 F05
- Issued
- Feb 3, 2017
- Abate by
- Feb 23, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.134(f)(5): The fit test was not administered using an OSHA-accepted qualitative fit test or quantitative fit test protocol: On or about 12/13/2016, at 385 Carr Drive in Brookville, OH, the employer required respirator use for employees who transfer methyl ethyl ketone peroxide and styrene, but did not administer fit-tests using an OSHA-accepted qualitative fit test or quantitative fit test protocol in that the employer used a Vick's VapoRub method.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.134 M02 I C
- Issued
- Feb 3, 2017
- Abate by
- Feb 23, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.134(m)(2)(i)(C): The employer did not establish a record of the qualitative and quantitative fit tests administered to an employee which included the specific make, model, style and size of respirator tested: On or about 12/13/2016, at 385 Carr Drive in Brookville, OH, the fit test records for employees did not include the specific make, model, and size of the respirator tested.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Fibre Glast Developments Corporation
View Fibre Glast Developments Corporation's full OSHA safety record →
More inspections in this industry (NAICS 424310)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341970465.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.