CALDWELL, ID —
OSHA Inspection: J. R. SIMPLOT COMPANY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of J. R. SIMPLOT COMPANY in 16733 SIMPLOT BLVD, CALDWELL, ID 83607 (NAICS 311999). OSHA activity number 341974913.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- J. R. SIMPLOT COMPANY
- Site address
- 16733 SIMPLOT BLVD
- City
- CALDWELL
- State
- ID
- ZIP
- 83607
- Mailing
- 16733 SIMPLOT BLVD, CALDWELL, ID 83607
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 311999
- Employees
- 575
- Ownership type
- A
Citations
12 citations on file for this inspection.
1910.119 D02 I E
- Issued
- May 3, 2017
- Abate by
- Jun 20, 2017
- Penalty
- Initial $6,772 · Current $4,200 Reduced
General-duty citation text
29 CFR 1910.119(d)(2)(i)(E): The process safety information did not include an evaluation of the consequences of deviations, including those affecting the safety and health of employees. a) On or about December 13, 2016, and at times prior thereto, consequences of deviations for the solenoid valve (CVLS6300806) and its removal. The solenoid was located on ammonia line (2-CD-CA80), which supplies ammonia to the oil separator system outside of the AC Warehouse Compressor Room, which was not considered in process safety information. Note: Abatement certification is required for this item.
Recent events (2)
- — I (S) $4200
- — Z (S) $6772
1910.119 E03 IV
- Issued
- May 3, 2017
- Abate by
- Jun 20, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(e)(3)(iv): The process hazard analysis did not address the consequences of failure of engineering and administrative controls: a) On or about December 13, 2016, and at times prior thereto, the employer did not determine the consequence of failure of Solenoid Valve (CVLS6300806) on ammonia line (2-CD-CA80) which supplies ammonia to the Oil Separator system outside of the AC Warehouse Compressor Room. Note: Abatement certification is required for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.119 I01
- Issued
- May 3, 2017
- Abate by
- Aug 31, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(i)(1): The employer did not perform a pre-startup safety review for new facilities and for modified facilities when the modification is significant enough to require a change in the process safety information. a) On or about December 13, 2016, and at times prior thereto, the employer did not perform a pre-startup safety review prior to the removal of a solenoid valve (CVLS6300806) from the oil separator system outside of the AC Warehouse Compressor Room. Note: Abatement certification is required for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.119 L01
- Issued
- May 3, 2017
- Abate by
- Jun 20, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(l)(1): The employer did not establish written procedures to manage changes to process chemicals, technology, equipment, and procedures, and changes to facilities that affect a covered process: a) On or about December 13, 2016, and at times prior thereto, the employer did not establish management of change procedures prior to the removal of a Solenoid Valve (CVLS6300806) from the Oil Separator system outside of the AC Warehouse Compressor Room. Note: Abatement certification is required for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.119 D03 I B
- Issued
- May 3, 2017
- Abate by
- Jun 20, 2017
- Penalty
- Initial $6,772 · Current $4,200 Reduced
General-duty citation text
29 CFR 1910.119(d)(3)(i)(B): The process safety information did not include information pertaining to the equipment in the process: a) On or about December 13, 2016, and at times prior thereto, the P&ID for the AC Warehouse was not accurate in that Check Valve CVLC6300789 was labeled CVLA6300789. b) On or about December 13, 2016, and at times prior thereto, the P&ID for the AC Warehouse was not accurate in that Corken Transfer Pump was not labeled the same on the P&ID. c) On or about December 13, 2016, and at times prior thereto, the P&ID for the AC Warehouse was not accurate in that the P&ID does not show sight glasses on transfer vessel (CRAM630013). d) On or about December 13, 2016, and at times prior thereto, the P&ID for the AC Warehouse was not accurate in that Solenoid Valve (CVLS6300806) was wired to Float Switch (CVLF6300814) on the Master Oil Scrubber. The wiring was not identified on the P&ID. e) On or about December 13, 2016, and at times prior thereto, the P&ID for the AC Warehouse was not accurate in that the float switch on the Suction Accumulator is not labeled on the P&ID. Note: Abatement certification is required for this item.
Recent events (2)
- — I (S) $4200
- — Z (S) $6772
1910.119 F01 III B
- Issued
- May 3, 2017
- Abate by
- Jun 20, 2017
- Penalty
- Initial $6,772 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(f)(1)(iii)[B]: The employer did not develop and implement written operating procedures that provide clear instructions for safety conducting activities involved in each covered process consistent with the process safety information and did not address at least safety and health considerations including precautions necessary to prevent exposure including engineering controls, administrative controls, and personal protective equipment. a) On or about November 13, 2016: An ammonia release incident in the AC Warehouse Engine Room led to the airborne release of ammonia detected by smell and a sulfur stick on the Oil Line to Compressor #1. Hand held ammonia detection devices were not utilized to analyze the incident. The J R Simplot SOP for Handling Incidental Releases, is based on respiratory protection being prescribed based on airborne concentrations of levels of ammonia. Note: Abatement certification is required for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $6772
1910.119 M03
- Issued
- May 3, 2017
- Abate by
- Jun 20, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(m)(3): An incident investigation team was not established and consisted of at least one person knowledgeable in the process involved, including a contract employee if the incident involved work of the contractor, and other persons with appropriate knowledge and experience to thoroughly investigate and analyze the incident. a) On or about November 13, 2016: An ammonia release incident in the AC Warehouse Engine Room led to the airborne release of ammonia detected by smell and a sulfur stick on the Oil Line to Compressor #1. After the incident an investigation team was not formed to investigate and analyze the incident. Note: Abatement certification is required for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.119 J02
- Issued
- May 3, 2017
- Abate by
- Aug 31, 2017
- Penalty
- Initial $6,772 · Current $4,200 Reduced
General-duty citation text
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going integrity of process equipment. a) On or about December 13, 2016, and at times prior thereto, the employer did not develop written procedures specific to the maintaining (prior to removal) of a solenoid valve (CVLS6300806) from the Oil Separator system outside of the AC Warehouse Compressor Room. Note: Abatement certification is required for this item.
Recent events (2)
- — I (S) $4200
- — Z (S) $6772
1910.119 J03
- Issued
- May 3, 2017
- Abate by
- Jun 20, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(j)(3): The employer did not train each employee involved in maintaining the on-going integrity of process equipment in an overview of that process and its hazards and in the procedures applicable to the employee's job tasks to assure that the employee can perform the job tasks in a safe manner. a) On or about December 13, 2016, and at times prior thereto, the employer did not train employees specific to on-going integrity of the Oil Separator system outside of the AC Warehouse Compressor Room prior to the removal of a solenoid valve. Note: Abatement certification is required for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.119 J04 I
- Issued
- May 3, 2017
- Abate by
- Jun 20, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(j)(4)(i): Inspections and tests were not performed on process equipment. a) On or about December 13, 2016, and at times prior thereto, Transfer vessel CRAM630013, had an expired pressure relief valve. b) On or about December 13, 2016, and at times prior thereto, the employer did not conduct inspections on a solenoid valve (CVLS6300806) from the Oil Separator system outside of the AC Warehouse Compressor Room. Note: Abatement certification is required for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.305 A02 II
- Issued
- May 3, 2017
- Abate by
- Jun 20, 2017
- Penalty
- Initial $5,079 · Current $3,000 Reduced
General-duty citation text
29 CFR 1910.305(a)(2)(ii): Temporary wiring was not removed immediately upon completion of the project or purpose for which the wiring was installed. a) On or about December 13, 2016, and at times prior thereto, in the AC Warehouse Compressor Room, an extension cord was feeding electrical power to a switch on a water line, and was frozen to an ammonia refrigeration pipe approximately 8 feet above ground level. Note: Abatement certification is NOT required for this item.
Recent events (2)
- — I (S) $3000
- — Z (S) $5079
1910.134 F02
- Issued
- May 3, 2017
- Abate by
- May 30, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.134(f)(2): Employee(s) using a tight-fitting facepiece respirator were not annually fit tested: (a) Idaho Plant: On or about December 13, 2016 and at times prior, employees are required wear respirators while responding to ammonia leaks. Employees have not been fit tested since April 2015. Note: Abatement certification is required for this item.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at J. R. Simplot Company
View J. R. Simplot Company's full OSHA safety record →
More inspections in this industry (NAICS 311999)
More inspections in ID
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341974913.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.