TEXAS CITY, TX —
OSHA Inspection: IRAD BARRIOS
Unprogrammed Other inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Other safety inspection of IRAD BARRIOS in 6130 LAGO MAR BLVD CATALON AT LAGO MAR APTS, TEXAS CITY, TX 77592 (NAICS 238130). OSHA activity number 341979540.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- IRAD BARRIOS
- Site address
- 6130 LAGO MAR BLVD CATALON AT LAGO MAR APTS
- City
- TEXAS CITY
- State
- TX
- ZIP
- 77592
- Mailing
- 4843 RAVEN RIDGE DRIVE, HOUSTON, TX 77253
What kind of inspection was it?
- Inspection type
- Unprogrammed Other (I)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 6
- Ownership type
- A
Citations
6 citations on file for this inspection.
1926.451 F07
- Issued
- Mar 23, 2017
- Abate by
- Apr 7, 2017
- Penalty
- Initial $2,390 · Current $1,434 Reduced
General-duty citation text
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration: a) At the Catalon Project, building 4: the Werner PJ-100 pump jack scaffold was not erected under the supervision and direction of a competent person qualified in scaffold erection.
Recent events (2)
- — I (S) $1434
- — Z (S) $2390
1926.451 B05 II
- Issued
- Mar 23, 2017
- Abate by
- Apr 7, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(b)(5)(ii): The end of a platform greater than 10 feet in length extended over its support more than 18 inches and the platform was not designed and installed so that the cantilevered portion of the platform was able to support employees without tipping, or had guardrails which blocked employee access to the cantilivered end: a) At the Catalon Project, Building 4: the Werner PJ-100 scaffold platform extended more than 18 inches beyond the supports, exposing employees to a fall hazard.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 C02
- Issued
- Mar 23, 2017
- Abate by
- Apr 7, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation: a) At the Catalon Project, Building 4: the Werner PJ-100 pump jack scaffold vertical poles were missing pole feet or equivalent base plates, exposing employees to a fall hazard.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 G03 IV
- Issued
- Mar 23, 2017
- Abate by
- Apr 7, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(g)(3)(iv): Vertical lifelines were attached to or used the same point of anchorage: a) At the Catalon Project, building 4: two employees working on a Werner pump jack scaffold were using vertical lifelines attached to the same roof anchor, exposing employees to a fall hazard.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.452 J02
- Issued
- Mar 23, 2017
- Abate by
- Apr 7, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.452(j)(2): Poles were not secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary: a) At the Catalon Project, building 4: the Werner PJ-100 pump jack scaffold did not have bottom and intermediate bracing, exposing employees to a fall hazard.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.454 B
- Issued
- Mar 23, 2017
- Abate by
- Apr 7, 2017
- Penalty
- Initial $2,390 · Current $1,434 Reduced
General-duty citation text
29 CFR 1926.454(b): The employer did not have each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question. At the Catalon Project, building 4: employees using a Werner PJ-100 pump jack scaffold to install siding at a height greater than 10 feet were not instructed in the recognition and avoidance of unsafe conditions and the applicable regulations, exposing employees to a fall hazard.
Recent events (2)
- — I (S) $1434
- — Z (S) $2390
More inspections at Irad Barrios
View Irad Barrios's full OSHA safety record →
More inspections in this industry (NAICS 238130)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341979540.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.