OSHA Inspection: EAST PENN MANUFACTURING COMPANY, INCORPORATED

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of EAST PENN MANUFACTURING COMPANY, INCORPORATED in DEKA ROAD, LYON STATION, PA 19536 (NAICS 335911). OSHA activity number 342000585.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch East Penn Manufacturing Company, Incorporated — free Get an email when a new federal OSHA severe-injury report for East Penn Manufacturing Company, Incorporated is published. One employer, no account, unsubscribe in one click.
Site address
DEKA ROAD
City
LYON STATION
State
PA
ZIP
19536
Mailing
102 DEKA ROAD, LYON STATION, PA 19536
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
335911
Employees
400
Ownership type
A

3 citations on file for this inspection.

1926.403 B02

Serious Gravity 10 1 instance 6 exposed
Issued
Mar 9, 2017
Abate by
Apr 4, 2017
Penalty
Initial $12,675 · Current $11,408 Reduced
29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification:    a) Building I2, Mezzanine Level; Switchgear S&T - On or about October 19, 2016 and times prior thereto, a distribution feeder was used as a tie circuit breaker within a double-ended substation.  Employees were exposed to electrocution hazards while working in switchgear S&T.    Abatement certification and documentation required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (3)
  • — F (S) $11407.5
  • — C (S) $12675
  • — Z (S) $12675

1926.416 A03

Serious Gravity 10 2 instances 15 exposed
Issued
Mar 9, 2017
Abate by
Apr 4, 2017
Penalty
Initial $12,675 · Current $11,408 Reduced
29 CFR 1926.416(a)(3): Before work began the employer did not ascertain by inquiry, direct observation, or by instruments, whether any part of an energized electric power circuit, exposed or concealed, was so located that the performance of the work could bring any person, tool, or machine into physical or electrical contact with the electric power circuit.  Nor did the employer post and maintain proper warning signs and advise employee(s) of the power circuit as required:      a) Building I2, Mezzanine Level; Switchgear S&T - On or about October 19, 2016 and times prior thereto, substation S side of the 480 volt switchgear was energized and the employer failed to assess the substation T side of the switchgear to determine if exposed bus bars were energized. Employees working on and near the substation T side of the switchgear were exposed to electrocution hazards.      b) Building I2, Mezzanine Level; Switchgear S&T - On or about October 19, 2016 and times prior thereto, the employer failed to post and maintain proper warning signs and instruct each employee in the recognition and avoidance of unsafe conditions while working on and near the partially complete and energized switchgear exposing the employees to electrocution hazards.    Abatement certification and documentation required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (3)
  • — F (S) $11407.5
  • — C (S) $12675
  • — Z (S) $12675

1926.20 B02

Serious Gravity 10 1 instance 15 exposed
Issued
Mar 9, 2017
Abate by
Apr 4, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.20(b)(2): The employer did not initiate and maintain programs which provided for frequent and regular inspections of the job site, materials and equipment to be made by a competent person(s):   a) Building I2, Mezzanine Level; Switchgear S&T - On or about October 19, 2016 and times prior thereto, a competent person did not inspect the installed switchgear prior to or after energization, exposing employees to electrocution hazards.  Abatement certification and documentation required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

View East Penn Manufacturing Company, Incorporated's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342000585.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.