Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: FRP ENGINEERING SOLUTIONS, LLC

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of FRP ENGINEERING SOLUTIONS, LLC in 224-A ROOSEVELT TRAIL, CASCO, ME 04015 (NAICS 423390). OSHA activity number 342012507.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch FRP Engineering Solutions, LLC — free Get an email when a new federal OSHA severe-injury report for FRP Engineering Solutions, LLC is published. One employer, no account, unsubscribe in one click.
Site address
224-A ROOSEVELT TRAIL
City
CASCO
State
ME
ZIP
04015
Mailing
P.O. BOX 605, SOUTH CASCO, ME 04077
Inspection type
Complaint (B)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
423390
Employees
4
Ownership type
A

10 citations on file for this inspection.

1903.19 C01

Other-than-serious 4 instances 2 exposed
Issued
Apr 4, 2017
Abate by
May 8, 2017
Penalty
Initial $305 · Current $305
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:  The employer did not provide abatement certification, in the following instances:  a)    Citation 1 Item 5 instance b;  b)    Citation 1 Item 6 instance b;  c)    Citation 1 Item 7; and  d)    Citation 2 Item 1.
Recent events (1)
  • — Z (O) $305

1903.19 D01

Other-than-serious 1 instance 2 exposed
Issued
Apr 4, 2017
Abate by
May 8, 2017
Penalty
Initial $0 · Current $0
29 CFR 1903.19(d)(1): The employer did not submit to the Agency documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required:  The employer did not submit abatement documentation in the form of photographs, receipts, reports, or programs for Citation 1 Item 5.
Recent events (1)
  • — Z (O) $0

1910.134 C

Serious Gravity 1 1 instance 4 exposed
Issued
Feb 8, 2017
Abate by
Feb 28, 2017
Penalty
Initial $1,630 · Current $1,630
29 CFR 1910.134(c): The employer did not develop and implement a written respiratory protection program with required worksite-specific procedures and elements for required respirator use:  Facility - The employer did not develop or implement a written respiratory protection program
Recent events (1)
  • — Z (S) $1630

1910.178 L06

Serious Gravity 5 1 instance 2 exposed
Issued
Feb 8, 2017
Abate by
Feb 16, 2017
Penalty
Initial $2,173 · Current $2,173
29 CFR 1910.178(l)(6):  The employer did not certify that each operator has been trained and evaluated as required by this paragraph (l):  Facility - The employer did not certify that each operator was trained and evaluated on the powered industrial truck they were operating.
Recent events (2)
  • — Z $65187
  • — Z (S) $2173

1910.178 Q07

Serious Gravity 5 1 instance 2 exposed
Issued
Feb 8, 2017
Abate by
Feb 16, 2017
Penalty
Initial $2,173 · Current $2,173
29 CFR 1910.178(q)(7): Industrial trucks were not examined before being placed in service:  Facility - The powered industrial truck was not examined for defects prior to each use.
Recent events (1)
  • — Z (S) $2173

1910.303 G01 I A

Serious Gravity 1 1 instance 4 exposed
Issued
Feb 8, 2017
Penalty
Initial $1,630 · Current $1,630
29 CFR 1910.303(g)(1)(i)(A): For electric equipment operating at 600 volts, nominal, or less to ground, and likely to require examination, adjustment, servicing, or maintenance while energized, the depth of the working space in the direction of access to live parts (as measured from the live parts where they were exposed or from the enclosure front or opening where they were enclosed) was less than indicated in Table S-1 of Subpart S of Part 1910:  Panel 3 - The 480 volt panel used to energize the air compressor was blocked by a metal garbage can and not cleared to 36 inch working space.
Recent events (1)
  • — Z (S) $1630

1910.303 G02 I

Serious Gravity 5 2 instances 4 exposed
Issued
Feb 8, 2017
Abate by
Feb 16, 2017
Penalty
Initial $2,716 · Current $2,716
29 CFR 1910.303(g)(2)(i): Except as elsewhere required or permitted by Subpart S of Part 1910, live parts of electric equipment operating  at 50 volts or more were not guarded against accidental contact by use of approved cabinets or other forms of approved enclosures or by any of the means identified in paragraphs (A), (B), (C), and (D) of 29 CFR 1910.303(g)(2)(i):  Employees were exposed to 480 volt energized parts, in the following instances:  a) Panel 3 - The entire cover plate was missing from the panel. b) Panel 4 - Twenty nine (29) single circuit breakers were missing from the 42 circuit panel.
Recent events (2)
  • — Z $13581
  • — Z (S) $2716

1910.305 B02 I

Serious Gravity 5 2 instances 7 exposed
Issued
Feb 8, 2017
Abate by
Feb 14, 2017
Penalty
Initial $2,716 · Current $2,716
29 CFR 1910.305(b)(2)(i): Each outlet box in completed installations did not have a cover, faceplate, or fixture canopy:  No faceplate or cover was on the outlet boxes, in the following instances:  a) Lay Up Room - Duplex with a switch and receptacle. b) Truck Bay - The gang box with single switch.
Recent events (1)
  • — Z (S) $2716

1910.1200 E01

Serious Gravity 1 1 instance 4 exposed
Issued
Feb 8, 2017
Abate by
Feb 28, 2017
Penalty
Initial $1,630 · Current $1,630
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met:  Facility - The employer did not develop or implement a written hazard communications program for employees working with hazardous chemicals such as styrene, methyl ethyl ketone, LP gas, and pneumatic tool oil.
Recent events (1)
  • — Z (S) $1630

1910.132 D02

Other-than-serious 1 instance 4 exposed
Issued
Feb 8, 2017
Abate by
Feb 16, 2017
Penalty
Initial $0 · Current $0
29 CFR 1910.132(d)(2): The employer did not verify that the required workplace hazard assessment has been performed through a written certification that identifies the workplace evaluated, the person certifying that the evaluation has been performed, the date(s) of the hazard assessment, and, which identifies the document as a certification of hazard assessment:  Facility - The employer did not verify that the workplace hazard assessment had been performed.
Recent events (1)
  • — Z (O) $0

View FRP Engineering Solutions, LLC's full OSHA safety record →