YORK, PA —
OSHA Inspection: CRISPUS ATTUCKS CHARTER SCHOOL
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of CRISPUS ATTUCKS CHARTER SCHOOL in 30 WEST BOUNDARY AVENUE, YORK, PA 17401 (NAICS 236118). OSHA activity number 342019734.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CRISPUS ATTUCKS CHARTER SCHOOL
- Site address
- 30 WEST BOUNDARY AVENUE
- City
- YORK
- State
- PA
- ZIP
- 17401
- Mailing
- 605 SOUTH DUKE STREET, YORK, PA 17401
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236118
- Employees
- 23
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.501 B13
- Issued
- Feb 3, 2017
- Penalty
- Initial $5,070 · Current $4,310 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system: (a) 30 West Boundary Avenue York, PA - Employee(s) were installing plywood flooring at the edge of the 2nd floor of a residential rehab home without the benefit of a fall protection system, thereby exposing employees to injuries from a fall of approximately 8 feet 6 inches to the lower level below, on or about January 11, 2017. (b) 30 West Boundary Avenue York, PA - Employee(s) were exposed to falling through a hole approximately 4 feet wide by 4 feet long thereby exposing employees to injuries from a fall of approximately 8 feet 6 inches to the lower level below, on or about January 11, 2017. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $4310
- — Z (S) $5070
1926.850 A
- Issued
- Feb 3, 2017
- Abate by
- Mar 2, 2017
- Penalty
- Initial $5,070 · Current $4,310 Reduced
General-duty citation text
29 CFR 1926.850(a): An engineering survey was not performed by a competent person to determine the conditions of the framing floors and walls and the possibility of unplanned collapse of any portion of the structure prior to permitting employees to start demolition operations: (a) 30 West Boundary Avenue York, PA - An engineering survey was not available in writing by a competent person prior to employees(s) commencing gut-rehab demolition operations of residential homes, thereby exposing employee(s) to a possible unplanned structural collapse, on or about January 11, 2017. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $4310
- — Z (S) $5070
1926.1101 K02 I
- Issued
- Feb 3, 2017
- Abate by
- Mar 2, 2017
- Penalty
- Initial $5,070 · Current $4,310 Reduced
General-duty citation text
29 CFR 1926.1101(k)(2)(i): Before work subject to this standard began, the building and/or facility owner(s) did not determine the presence, location and quantity of asbestos containing material (ACM) and/or presumed asbestos containing material (PACM) at the worksite pursuant to 29 CFR 1926.1101(k)(1): (a) 30 West Boundary Avenue York, PA - Crispus Attucks Charter School the buildings owner did not determine the presence, location and quantity of asbestos containing material before commencing gut-rehab demolition operations of residential homes, thereby exposing employee(s) to a possible health hazards, on or about January 11, 2017. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $4310
- — Z (S) $5070
1926.62 D01
- Issued
- Feb 3, 2017
- Abate by
- Mar 2, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.62(d)(1): Each employer who had a workplace or operation covered by 29 CFR 1926.62 did not initially determine if any employee was exposed to lead at or above the action level of 30 micrograms per cubic meter of air (30ug/m3) calculated as an 8-hour time-weighted average (TWA): (a) 30 West Boundary Avenue York, PA - Crispus Attucks Charter School the buildings owner did not conduct personal monitoring to determine if employees were exposed to lead containing material at or above the action level before commencing gut-rehab demolition operations of residential homes, thereby exposing employee(s) to a possible health hazards, on or about January 11, 2017. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.132 D02
- Issued
- Feb 3, 2017
- Abate by
- Mar 2, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.132(d)(2): The employer did not verify, through a written certification, that the required workplace hazard assessment had been performed: (a) 30 West Boundary Avenue York, PA- The employer did not assess the workplace to determine if hazards were present, which necessitated the use of personal protective equipment (PPE) and did not prepare a written certification that the workplace hazard assessment had been completed, on or about January 11, 2017. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections in this industry (NAICS 236118)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342019734.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.