BROWNSVILLE, WI —
OSHA Inspection: MICHELS CORPORATION
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of MICHELS CORPORATION in 817 W. MAIN STREET, BROWNSVILLE, WI 53006 (NAICS 325991). OSHA activity number 342062387.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MICHELS CORPORATION
- Site address
- 817 W. MAIN STREET
- City
- BROWNSVILLE
- State
- WI
- ZIP
- 53006
- Mailing
- P.O. BOX 128, BROWNSVILLE, WI 53006
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 325991
- Employees
- 280
- Ownership type
- A
Citations
10 citations on file for this inspection.
5(a)(1)
- Issued
- Feb 1, 2017
- Abate by
- Aug 12, 2019
- Penalty
- Initial $9,959 · Current $10,000
General-duty citation text
OSH ACT of 1970 Section (5)(a)(1): The employer shall assess the Cured-In-Place-Pipe Process in order to identify, evaluate and control any hazards involved in the process. On or about August 8, 2016, the employer did not assess the Cured-In-Place-Pipe process at its facility at 817 W. Main Street, Brownsville, Wisconsin in order to identify, evaluate and control the hazards involved in the process.
Recent events (3)
- — F (S) $10000
- — C (S) $9959
- — Z (S) $9959
1910.119 D03 I
- Issued
- Feb 1, 2017
- Abate by
- Feb 23, 2017
- Penalty
- Initial $9,959 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(d)(3)(i): The employer did not compile information pertaining to the equipment in the process On or about August 8, 2016, and at times prior to and thereafter, the employer did not compile information pertaining to the equipment in the wet out process within the CIPP operations, including but not limited to the following: a) Materials of construction of the wet out process equipment was not compiled. b) Piping and instrument diagrams of the wet out process were not compiled. c) Electrical classification documentation of the wet out process was not compiled. d) Relief system design and design basis of the tanks and equipment was not compiled. e) Ventilation system design information of the wet out process area was not compiled. f) Design codes and standards were not compiled. g) Material and energy balances for the wet out process was not compiled. h) Safety systems listing was not compiled.
Recent events (3)
- — F (S) $0
- — C (S) $9959
- — Z (S) $9959
1910.119 D03 II
- Issued
- Feb 1, 2017
- Abate by
- Feb 23, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(d)(3)(ii): The employer did not document that equipment complied with recognized and generally accepted good engineering practices. On or about August 8, 2016, and at times prior to and thereafter, the employer did not document that the wet out process complied with recognized and generally accepted good engineering practices, including but not limited to NFPA 30 Flammable and Combustible Liquids Code, 2012: a) The employer did not document that ignition sources, such as but not limited to, static and electrical sparks, were controlled per 6.5.1 b) The employer did not document that operations involving flammable and combustible liquids shall be reviewed to ensure that fire and explosion hazards are addressed by fire prevention, fire control, and emergency action plans per 6.4.1 and 21.6.3.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1910.119 E01
- Issued
- Feb 1, 2017
- Abate by
- Feb 23, 2017
- Penalty
- Initial $9,959 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(e)(1): The employer did not perform an initial process hazard analysis on processes covered by 29 CFR 1910.119: On or about August 8, 2016, and at times prior to and thereafter, the employer did not conduct a process hazard analysis on the wet out process within the CIPP operations.
Recent events (3)
- — F (S) $0
- — C (S) $9959
- — Z (S) $9959
1910.119 I01
- Issued
- Feb 1, 2017
- Abate by
- Feb 23, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(i)(1): The employer did not perform a pre-startup safety review for new facilities and for modified facilities when the modification was significant enough to require a change in the process safety information. On or about August 8, 2016, and at times prior to and thereafter, the employer did not perform a pre-startup safety review for the wet out process within the CIPP operations.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1910.119 O01
- Issued
- Feb 1, 2017
- Abate by
- Feb 23, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(o)(1): The employer did not certify that they have evaluated compliance with the provisions of this section at least every three years: On or about August 8, 2016, and at times prior to and thereafter, the employer did not certify that they had evaluated the management system for the wet out process was in compliance with the provisions of 29 CFR 1910.119 at least every three years.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1910.119 F01 I D
- Issued
- Feb 1, 2017
- Abate by
- Feb 23, 2017
- Penalty
- Initial $9,959 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(f)(1)(i)(D): The employer did not develop and implement written operating procedures that provide clear instructions for emergency shutdown, including the conditions under which emergency shutdown is required, and the assignment of shutdown responsibility to qualified operators to ensure that emergency shutdown is executed in a safe and timely manner. On or about August 8, 2016, and at times prior to and thereafter, the employer's written operating procedures for the wet out process did not provide clear instructions for emergency shutdown, including the conditions under which emergency shutdown is required, and the assignment of shutdown responsibility to qualified operators to ensure that emergency shutdown is executed in a safe and timely manner.
Recent events (3)
- — F (S) $0
- — C (S) $9959
- — Z (S) $9959
1910.119 F01 II
- Issued
- Feb 1, 2017
- Abate by
- Feb 23, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(f)(1)(ii): The employer did not develop and implement written operating procedures that provided clear instructions for safely conducting activities involved in each covered process consistent with the process safety information that addressed operating limits. On or about August 8, 2016, and at times prior to and thereafter, the employer's written operating procedures for the wet out process did not provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information that addressed operating limits, including consequences of deviation from the operating limits and steps to correct or avoid deviation.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1910.119 J02
- Issued
- Feb 1, 2017
- Abate by
- Feb 23, 2017
- Penalty
- Initial $9,959 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(j)(2): The employer did not establish written procedures to maintain the on-going integrity of process equipment: On or about August 8, 2016, and at times prior to and thereafter, the employer did not establish written procedures to maintain the on-going integrity of the wet out process equipment, including, but not limited to, the following: a) The employer did not establish written procedures for inspection and testing the temperature indicator (thermocouple) on the small Mix Tank. b) The employer did not establish written procedures for inspection and testing the temperature indicators (thermocouples) on the resin tanks. c) The employer did not establish written procedures for inspecting and testing the automated glycol heating/cooling system for the resin tanks.
Recent events (3)
- — F (S) $0
- — C (S) $9959
- — Z (S) $9959
1910.119 J04 I
- Issued
- Feb 1, 2017
- Abate by
- Feb 23, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(j)(4)(i): The employer did not perform inspection and tests on process equipment. On or about August 8, 2016, and at times prior to and thereafter, the employer did not perform inspections and tests of the wet out process equipment, including, but not limited to, the following: a) The employer did not inspect and test the temperature indicator (thermocouple) on the small Mix Tank. b) The employer did not inspect and test the temperature indicators (thermocouples) on the resin tanks. c) The employer did not inspect and test the automated glycol heating/cooling system for the resin tanks.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
More inspections at Michels Corporation
View Michels Corporation's full OSHA safety record →
More inspections in this industry (NAICS 325991)
More inspections in WI
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342062387.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.