OSHA Inspection: DANA INCORPORATED

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of DANA INCORPORATED in 1040 CENTER AVE, POTTSTOWN, PA 19464 (NAICS 336350). OSHA activity number 342101060.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Dana Incorporated — free Get an email when a new federal OSHA severe-injury report for Dana Incorporated is published. One employer, no account, unsubscribe in one click.
Establishment
DANA INCORPORATED
Site address
1040 CENTER AVE
City
POTTSTOWN
State
PA
ZIP
19464
Mailing
1040 CENTER AVE, POTTSTOWN, PA 19464
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
336350
Employees
320
Ownership type
A

8 citations on file for this inspection.

1910.146 D14

Serious Gravity 5 1 instance 6 exposed
Issued
Apr 10, 2017
Abate by
Apr 28, 2017
Penalty
Initial $8,465 · Current $8,465
29 CFR 1910.146(d)(14): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not review the permit-required confined space program, using the canceled permits retained under 29 CFR 1910.146(e)(6) within one year after each entry:   a) Facility Wide: Employees are required to enter various permit required confined spaces to conduct maintenance and the Confined Space Entry Program had not been reviewed within one year after each entry, on or about March 29, 2017.  NOTE: Employers may perform a single annual review covering all entries performed during 12-month period. If no entry is performed during a 12-month period, no review is necessary.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $8465
  • — Z (S) $8465

1910.146 F

Serious Gravity 5 1 instance 6 exposed
Issued
Apr 10, 2017
Abate by
Apr 28, 2017
Penalty
Initial $0 · Current $0
29 CFR 1910.146(f): The entry permit that documented compliance with this section and authorized entry into a permit space did not identify the requirements in (f)(1)-(15) of this section:   a) Pusher Furnace: The Confined Space Entry Permit did not identify the purpose of the entry or the description of the work to be performed, on or about February 13, 2017.     b) Pusher Furnace: The Confined Space Entry Permit did not identify the hazards of the permit space to be entered, on or about February 13, 2017.     c) Pusher Furnace: The Confined Space Entry Permit did not identify the names or initials of the employees who perform the periodic tests required under paragraph (d)(5), on or about February 13, 2017.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.146 J03

Serious Gravity 5 1 instance 6 exposed
Issued
Apr 10, 2017
Abate by
Apr 28, 2017
Penalty
Initial $0 · Current $0
29 CFR 1910.146(j)(3): The employer did not ensure that each entry supervisor terminated the entry and canceled the permit as required by 29 CFR 1910.146(e)(5):  a) Pusher Furnace: The Confined Space Entry Permit dated February 1, 2017 was not terminated by the entry supervisor, on or about February 13, 2017.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.146 G01

Serious Gravity 5 1 instance 6 exposed
Issued
Apr 10, 2017
Abate by
Apr 24, 2017
Penalty
Initial $8,465 · Current $0 Reduced
29 CFR 1910.146(g)(1): The employer did not provide training so that all employees whose work was regulated by 29 CFR 1910.146 (permit required confined spaces) acquired the understanding, knowledge, and skills necessary for the safe performance of the duties assigned under 29 CFR 1910.146:    a) Pusher Furnace: Employees required to enter the permit required confined space to adjust the tracks and clean the furnace were not provided training so that they had the understanding, knowledge, and skills necessary to properly use atmosphere testing equipment required for safe entry, on or about February 7, 2017.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $8465

1910.146 G02 I

Serious Gravity 5 1 instance 1 exposed
Issued
Apr 10, 2017
Abate by
Apr 24, 2017
Penalty
Initial $0 · Current $0
29 CFR 1910.146(g)(2)(i): The employer did not provide training to each affected employee before the employee was first assigned duties under 29 CFR 1910.146, Permit-required confined spaces:    a) Pusher Furnace: An employee acting as the Authorized Attendant while other employees entered the permit required confined space was not provided training prior to being assigned duties under 29 CFR 1910.146, on or about February 7, 2017.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.146 J04

Serious Gravity 5 1 instance 6 exposed
Issued
Apr 10, 2017
Abate by
May 15, 2017
Penalty
Initial $8,465 · Current $8,465
29 CFR 1910.146(j)(4): The employer did not ensure that each entry supervisor verified that rescue services were available and that the means for summoning them were operable:  a) Pusher Furnace: Employees were required to enter the confined space to clean and adjust the tracks and the employer did not ensure the entry supervisor verified that rescue services were available, on or about February 7, 2017.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $8465
  • — Z (S) $8465

1910.146 K01 IV

Serious Gravity 5 1 instance 6 exposed
Issued
Apr 10, 2017
Abate by
May 15, 2017
Penalty
Initial $0 · Current $0
29 CFR 1910.146(k)(1)(iv): The employer who had designated rescue and emergency services did not inform each rescue team or service of the hazards they may confront when called to perform rescue at the site:  a) Pusher Furnace: Employees were required to enter the confined space to clean and adjust the tracks and the employer did not inform the rescue service of the hazards they may encounter during a rescue such as hazardous atmosphere and obstacles inside furance, on or about February 7, 2017   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.146 K01 V

Serious Gravity 5 1 instance 6 exposed
Issued
Apr 10, 2017
Abate by
May 15, 2017
Penalty
Initial $0 · Current $0
29 CFR 1910.146(k)(1)(v): The employer who had designated rescue and emergency services did not provide the selected rescue team or service  with access to all permit spaces from which rescue could  be necessary, so that the rescue service could develop:  a) Pusher Furnace: Employees were required to enter the confined space to clean and adjust the tracks and the employer did not provide access to the rescue service so that they could develop an appropriate rescue plan and practice rescues, on or about February 7, 2017.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Dana Incorporated's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342101060.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.