Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: NUCORE ELECTRIC, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of NUCORE ELECTRIC, INC. in THORTON'S GAS STATION DEVELOPMENT 1330 SOUTH NELTNOR BOULEVARD, WEST CHICAGO, IL 60186 (NAICS 236220). OSHA activity number 342113834.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Nucore Electric, INC. — free Get an email when a new federal OSHA severe-injury report for Nucore Electric, INC. is published. One employer, no account, unsubscribe in one click.
Site address
THORTON'S GAS STATION DEVELOPMENT 1330 SOUTH NELTNOR BOULEVARD
City
WEST CHICAGO
State
IL
ZIP
60186
Mailing
651 S. SUTTON ROAD STE 305, STREAMWOOD, IL 60107
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
2
Ownership type
A

3 citations on file for this inspection.

1904.40 A

Other-than-serious 1 instance 1 exposed
Issued
Jul 21, 2017
Penalty
Initial $724 · Current $724
29 CFR 1904.40(a):  When an authorized government representative asks for the records you keep under Part 1904, you must provide copies of the records within four (4) business hours:   a. Record-keeping - On or about March 06, 2017 at approximately 0845, a document request was issued to employer specifying OSHA record-keeping documents within five working days (Due no later than the close of business on March 14, 2018). This request was answered on March, 22, 2016.   b. Record-keeping - On or about March 06, 2017 at approximately 1100 records were requested during telephonic conference for the referenced inspection. Documents were not provided in accordance with OSHA requirements.  This request was answered on July 20, 2017.   There is no abatement certification of documentation required for this item.
Recent events (1)
  • — Z (O) $724

1926.20 B02

Other-than-serious 2 instances 2 exposed
Issued
Jul 21, 2017
Abate by
Aug 11, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.20(b)(2): The employer did not initiate and maintain programs which provided for frequent and regular inspections of the job site, materials and equipment to be made by a competent person(s):  a. On or about February 17, 2017, employees engaged in construction activity at the above referenced worksite were required to operate a scissor lift in the performance of their assigned duties. The employer failed to provide workers with a site specific safety plan that included at a minimum, a mandate for frequent and regular inspection of any and all equipment used by the employees at the worksite, and made / conducted by a competent person as designated by the employer. This plan also requires a provision / method for reporting any equipment defects or maintenance needs.    b. On or about February 17, 2017, employees engaged in construction activity at the above referenced worksite were required to operate a scissor lift in the performance of their assigned duties. The employer failed to ensure that employees inspected the area where the scissor lift was to be operated, to ensure the operating surface would sustain the weight of the lift, and was free of all obstructions.   Abatement documentation is required for this item in accordance with 29 CFR 1903.19(d).
Recent events (1)
  • — Z (O) $0

1926.454 A03

Other-than-serious 1 instance 2 exposed
Issued
Jul 21, 2017
Abate by
Aug 11, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.454(a)(3): The employer did not train each employee who performs work on a scaffold, by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards, including the proper use of the scaffold and the proper handling of materials on the scaffold:  a. On or about February 17, 2017, employees engaged in construction activity at the above referenced worksite were required to operate a scissor lift in the performance of their assigned duties. The employer failed to provide workers training on hazards, including how to work safely with or near scissor lifts in accordance with this OSHA standard. Employees became stranded in a scissors lift on the worksite and were unaware of the location of the equipment's manufacturers instructions for operating the scissor lift vertically and / or emergency procedures for lowering the unit.   Abatement documentation is required for this item in accordance with 29 CFR 1903.19(d).
Recent events (1)
  • — Z (O) $0

View Nucore Electric, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342113834.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.