SALEM, VA —
OSHA Inspection: VISN 6 CENTRALIZED ACCOUNTING UNIT
Unprogrammed Related inspection · Health discipline
At a glance
On , OSHA opened an unprogrammed Related health inspection of VISN 6 CENTRALIZED ACCOUNTING UNIT in BLDG 75, 1ST AND 2ND FLOOR, SALEM, VA 24153 (NAICS 921190). OSHA activity number 342142700.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- VISN 6 CENTRALIZED ACCOUNTING UNIT
- Site address
- BLDG 75, 1ST AND 2ND FLOOR
- City
- SALEM
- State
- VA
- ZIP
- 24153
- Mailing
- 1601 BRENNER AVE., SALISBURY, NC 28144
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 921190
- Employees
- 71
- Ownership type
- D
Citations
1 citation on file for this inspection.
1960.8 A
- Issued
- Mar 16, 2017
- Abate by
- Jun 12, 2017
- Penalty
- Initial $0 · Current $0
R278
General-duty citation text
29 CFR 1960.8(a): The Agency head did not furnish employment and a place of employment to each employee that was free from recognized hazards that caused or were likely to cause death or serious physical harm: 1970 Roanoke Blvd, Salem, VA 24153, Building 75: On or about December 20, 2016, and times prior thereto, employees were exposed to the hazard of mold in work spaces and corridors, exposing employees to potential onset of allergic reactions, asthma attacks, and exacerbation or aggravation of allergies, asthma and other health conditions. The employer did not implement adequate measures to prevent active mold growth in the building. Among other methods, feasible and acceptable means to abate the hazard of mold include: 1. Identify and correct the conditions that permit mold growth by following American National Standards Institute (ANSI) / Institute of Inspection, Cleaning and Restoration Certification (IICRC) S520, Standard and Reference Guide for Professional Mold Remediation, or similar guidance. 2. Ensure ventilation requirements are met by following the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) Standard 62, Ventilation for Acceptable Indoor Air Quality, or similar guidance. 3. Protect the health and safety of the building occupants and persons who remediate mold by establishing appropriate containment and worker protections. a. Temporary relocation of some or all of the building occupants may be appropriate. b. Personal protective equipment may include goggles, long gloves, protective clothing, and respiratory protection.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 921190)
More inspections in VA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342142700.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.