On , OSHA opened a planned safety inspection of M & B MASONRY in 3156 CITY SCRAP DR NE, WASHINGTON, DC 20012 (NAICS 238140). OSHA activity number 342155637.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- M & B MASONRY
- Site address
- 3156 CITY SCRAP DR NE
- City
- WASHINGTON
- State
- DC
- ZIP
- 20012
- Mailing
- 6717 GOUTHIER RD, FALLS CHURCH, VA 22042
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 7
- Ownership type
- A
Citations
10 citations on file for this inspection.
1926.451 B01 I
- Issued
- Mar 17, 2017
- Abate by
- Mar 27, 2017
- Penalty
- Initial $4,183 · Current $4,183
General-duty citation text
29 CFR 1926.451(b)(1)(i): Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) was not installed so that the space between adjacent units and the space between the platform and the uprights were no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary. a) On or about February 14, 2017, Eastside of building, the working platform of the scaffold system was not fully planked exposing employees to a fall hazard of 30-35 foot fall to ground level while conducting masonry work. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $4183
1926.451 B10
- Issued
- Mar 17, 2017
- Abate by
- Mar 27, 2017
- Penalty
- Initial $2,390 · Current $2,390
General-duty citation text
29 CFR 1926.451(b)(10): Scaffold components manufactured by different manufacturers were intermixed such that the components fit together with force and the scaffold's structural integrity was not maintained by the user. a) On or about February 14, 2017, Eastside of building, employees observed working platform on a scaffold system which had two different manufacturers components was used. The lower section had one manufacturer and the upper had another located at one end of the scaffold. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (1)
- — Z (S) $2390
1926.451 C01 II
- Issued
- Mar 17, 2017
- Abate by
- Mar 27, 2017
- Penalty
- Initial $4,183 · Current $4,183
General-duty citation text
29 CFR 1926.451(c)(1)(ii): Guys, ties, and/or braces were not installed according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height and repeated vertically at locations of horizontal members every 20 feet (56.1 m) or less thereafter for scaffolds 3 feet ((0.91 m) wide or less, and every 26 feet (7.9 m) or less therafter for scaffolds greater than 3 feet (0.91m) wide. a) On or about February 14, 2017, Eastside of building, employees were exposed to an estimated 30-35 foot fall to ground level while working on a scaffold system that was not properly secured from tipping. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $4183
1926.451 E01
- Issued
- Mar 17, 2017
- Abate by
- Mar 27, 2017
- Penalty
- Initial $4,183 · Current $4,183
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access. a) On or about February 14, 2017, Eastside of building, employees were exposed to an estimated 30-35 foot fall to ground level while accessing the working platform on a scaffold system by either using the frame or crossing from one scaffold to another. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $4183
1926.451 F03
- Issued
- Mar 17, 2017
- Abate by
- Mar 27, 2017
- Penalty
- Initial $4,183 · Current $4,183
General-duty citation text
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity: a) On or about February 14, 2017, Eastside of building, employees were observed working on a scaffold system that had not been inspected by a competent person prior to the start of shift who understands the requirements and the hazards associated with scaffold components; the scaffold at the site had planks that were damaged, pins and bracing missing. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $4183
1926.451 F07
- Issued
- Mar 17, 2017
- Abate by
- Mar 27, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person. a) On or about February 14, 2017, Eastside of building, the erected scaffold system used to conduct masonry work exposed employees to several fall hazards such as but not limited to missing railing, working platform not fully planked, and safe access; exposing them to an estimated 30-35 foot fall to ground level. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $0
1926.451 G01 VI
- Issued
- Mar 17, 2017
- Abate by
- Mar 27, 2017
- Penalty
- Initial $4,183 · Current $4,183
General-duty citation text
29 CFR 1926.451(g)(1)(vi): Each employee performing overhand bricklaying operations from a supported scaffold was not protected from falling from all open sides and ends of the scaffold (except at the side next to the wall being laid) by the use of a personal fall arrest system or guardrail system (with minimum 200 pound toprail capacity). a) On or about February 14, 2017, Eastside of building, employees were exposed to an estimated 30-35 foot fall to ground level while working on an unguarded scaffold system. b) On or about February 14, 2017, Eastside of building, employees on the working platform of the scaffold were exposed to a fall hazard while working near the unguarded ends of the scaffold system; 30-35 foot fall to ground level. c) On or about February 14, 2017, Eastside of building, employees on the working platform of the scaffold system were not protected by a railing system exposing them to a 30-35 foot fall to ground level. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $4183
1926.452 C04
- Issued
- Mar 17, 2017
- Abate by
- Mar 27, 2017
- Penalty
- Initial $4,183 · Current $4,183
General-duty citation text
29 CFR 1926.452(c)(4): End frames of tubular welded frame scaffolding were not locked together vertically by use of pins or equivalent means in areas where uplift could occur: a) On or about February 14, 2017, Eastside of building, employees were observed working on a scaffold system (30 feet from ground level) which was not properly joined by the stacking pins. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $4183
1926.454 A
- Issued
- Mar 17, 2017
- Abate by
- Mar 27, 2017
- Penalty
- Initial $4,183 · Current $4,183
General-duty citation text
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. a) On or about February 14, 2017, Eastside of building, employees working on a 30ft. scaffold system were not trained by a qualified person in the understanding, recognizing, avoidance and procedures to control those hazards associated with working on or near a scaffold. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $4183
1926.454 B
- Issued
- Mar 17, 2017
- Abate by
- Mar 27, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.454(b): The employer did not have each employee who was involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work. a) On or about February 14, 2017, Eastside of building, employees working on a 30ft. scaffold system were not trained by a qualified person in the understanding, recognizing, avoidance and procedures to control those hazards associated with working on or near a scaffold. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $0
More inspections at M & B Masonry
View M & B Masonry's full OSHA safety record →
More inspections in this industry (NAICS 238140)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342155637.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.