ORANGE, CA —
OSHA Inspection: CADILLAC PLATING CO. INC.
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of CADILLAC PLATING CO. INC. in 1147 W. STRUCK AVE., ORANGE, CA 92867 (NAICS 332813). OSHA activity number 342193109.
Where did this inspection happen?
- Establishment
- CADILLAC PLATING CO. INC.
- Site address
- 1147 W. STRUCK AVE.
- City
- ORANGE
- State
- CA
- ZIP
- 92867
- Mailing
- 1147 W. STRUCK AVE., ORANGE, CA 92867
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332813
- Employees
- 10
- Ownership type
- A
Citations
18 citations on file for this inspection.
461(A)
- Issued
- Penalty
- Initial $175.00 · Current $100.00 Reduced
Recent events (3)
- — F (O) $100
- — C (O) $175
- — Z (O) $175
23400022 B
- Issued
- Penalty
- Initial $325.00 · Current $50.00 Reduced
Recent events (3)
- — F (O) $50
- — C (O) $325
- — Z (O) $325
25000025
- Issued
- Penalty
- Initial $195.00 · Current $50.00 Reduced
Recent events (3)
- — F (O) $50
- — C (O) $195
- — Z (O) $195
3221(C)
- Issued
- Penalty
- Initial $390.00 · Current $50.00 Reduced
Recent events (3)
- — F (O) $50
- — C (O) $390
- — Z (O) $390
3221(D)
- Issued
- Penalty
- Initial $390.00 · Current $50.00 Reduced
Recent events (3)
- — F (O) $50
- — C (O) $390
- — Z (O) $390
3273(A)
- Issued
- Penalty
- Initial $260.00 · Current $50.00 Reduced
Recent events (3)
- — F (O) $50
- — C (O) $260
- — Z (O) $260
3650(T)(1)
- Issued
- Penalty
- Initial $325.00 · Current $50.00 Reduced
Recent events (3)
- — F (O) $50
- — C (O) $325
- — Z (O) $325
5144(C)(1)
- Issued
- Penalty
- Initial $325.00 · Current $50.00 Reduced
Recent events (3)
- — F (O) $50
- — C (O) $325
- — Z (O) $325
5194(E)(1)
- Issued
- Penalty
- Initial $325.00 · Current $50.00 Reduced
Recent events (3)
- — F (O) $50
- — C (O) $325
- — Z (O) $325
23200001 A
- Issued
- Penalty
- Initial $3935.00 · Current $900.00 Reduced
Recent events (3)
- — F (S) $900
- — C (S) $3935
- — Z (S) $3935
23400017 A
- Issued
- Penalty
- Initial $3150.00 · Current $900.00 Reduced
Recent events (3)
- — F (S) $900
- — C (S) $3150
- — Z (S) $3150
25000008 A
- Issued
- Penalty
- Initial $1575.00 · Current $900.00 Reduced
Recent events (3)
- — F (S) $900
- — C (S) $1575
- — Z (S) $1575
3203(A)
- Issued
- Penalty
- Initial $3150.00 · Current $900.00 Reduced
Recent events (3)
- — F (S) $900
- — C (S) $3150
- — Z (S) $3150
3382(A)
- Issued
- Penalty
- Initial $3150.00 · Current $900.00 Reduced
Recent events (3)
- — F (S) $900
- — C (S) $3150
- — Z (S) $3150
4070(A)
- Issued
- Penalty
- Initial $3935.00 · Current $900.00 Reduced
Recent events (3)
- — F (S) $900
- — C (S) $3935
- — Z (S) $3935
5031(A)
- Issued
- Penalty
- Initial $3935.00 · Current $900.00 Reduced
Recent events (3)
- — F (S) $900
- — C (S) $3935
- — Z (S) $3935
5141(A)
- Issued
- Penalty
- Initial $3935.00 · Current $900.00 Reduced
Recent events (3)
- — F (S) $900
- — C (S) $3935
- — Z (S) $3935
5162(C)
- Issued
- Penalty
- Initial $3150.00 · Current $900.00 Reduced
Recent events (3)
- — F (S) $900
- — C (S) $3150
- — Z (S) $3150
More inspections in this industry (NAICS 332813)
PLYMOUTH, MA—2026-07-15
TECH-ETCH, INC.
WICHITA, KS—2026-07-15
PREMIER PROCESSING LLC
WARREN, MI—2026-07-14
AJAX METAL PROCESSING, INC
JEFFERSON, OH—2026-07-10
LAKE CITY PLATING LLC
WARSAW, IN—2026-07-08
SURFACE ENHANCEMENTS
More inspections in CA
EL CAJON, CA—2026-07-16
GRANITE AND MARBLE CONCEPTS INC.
LIVERMORE, CA—2026-07-16
RJMS CORPORATION
BAKERSFIELD, CA—2026-07-16
MAYORGA FARM LABOR SERVICES
SANTA PAULA, CA—2026-07-16
AHUATZI PRODUCE INC.
SANTA PAULA, CA—2026-07-16
MENDOZA PRODUCE
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342193109.