NEW YORK, NY —
OSHA Inspection: MC CONSTRUCTION CONSULTING INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of MC CONSTRUCTION CONSULTING INC. in 36 WEST 93RD ST, NEW YORK, NY 10025 (NAICS 236220). OSHA activity number 342210077.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MC CONSTRUCTION CONSULTING INC.
- Site address
- 36 WEST 93RD ST
- City
- NEW YORK
- State
- NY
- ZIP
- 10025
- Mailing
- 57-45 57TH DRIVE, MASPETH, NY 11378
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236220
- Employees
- 16
- Ownership type
- A
Citations
6 citations on file for this inspection.
1926.403 B02
- Issued
- May 2, 2017
- Penalty
- Initial $2,173 · Current $1,630 Reduced
General-duty citation text
29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification: a) Boiler Room - On or prior to March 30, 2017, employees were exposed to electrical hazards due to the use of the welding power cord and other power cords not used in accordance with instructions including, but not limited to, not providing Ground-Fault Protection for employees using equipment plugged into the power cords and the flexible power cords were not protected from accidental damage or installed properly. The welding power cord and other power cords were directly connected to 30 Amp breakers in the 208Y/120V 3PH 4W electrical panel with its cover removed.
Recent events (2)
- — I (S) $1629.75
- — Z (S) $2173
1926.403 I02 I
- Issued
- May 2, 2017
- Penalty
- Initial $2,173 · Current $1,630 Reduced
General-duty citation text
29 CFR 1926.403(i)(2)(i): Live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by cabinets or other forms of enclosures, nor by any of the means listed in subparagraphs (A) through (D) of this paragraph: a) Boiler Room - On or prior to March 30, 2017, employees were exposed to electrical hazards due to a 208Y/120V 3PH 4W electrical panel had its cover removed.
Recent events (2)
- — I (S) $1629.75
- — Z (S) $2173
1926.404 B01 II
- Issued
- May 2, 2017
- Penalty
- Initial $2,173 · Current $1,630 Reduced
General-duty citation text
29 CFR 1926.404(b)(1)(ii): On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupters for personal protection: a) Boiler Room - On or prior to March 30, 2017, employees were exposed to electrical hazards due to the welding power cord outlet and the other power cord outlets directly connected to 30 Amp breakers in the 208Y/120V 3PH 4W electrical panel with its cover removed did not have approved ground fault circuit interrupters (GFCIs) for personal protection.
Recent events (2)
- — I (S) $1629.75
- — Z (S) $2173
1926.405 A02 I
- Issued
- May 2, 2017
- Penalty
- Initial $2,173 · Current $1,630 Reduced
General-duty citation text
29 CFR 1926.405(a)(2)(i): Temporary wiring was not removed immediately upon completion of construction or the purpose for which the wiring was installed: a) Boiler Room - On or prior to March 30, 2017 employees were exposed to electrical hazards due to temporary wiring used for welding not being removed immediately upon completion of the welding. A temporary welding power cord and other power cords were directly connected to 30 Amp breakers in the 208Y/120V 3PH 4W electrical panel.
Recent events (2)
- — I (S) $1629.75
- — Z (S) $2173
1926.405 A02 II I
- Issued
- May 2, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.405(a)(2)(ii)(I): Flexible cords and cables used for temporary wiring were not protected from damage: a) Boiler Room - On or prior to March 30, 2017, employees were exposed to electrical hazards due to the temporary welding power cord and other power cords that were directly connected to 30 Amp breakers in the 208Y/120V 3PH 4W electrical panel not being protected from damage.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.405 G02 IV
- Issued
- May 2, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.405(g)(2)(iv): Flexible cords were not connected to devices and fittings so that strain relief is provided to prevent pull from being directly transmitted to joints or terminal screws: a) Boiler Room - On or prior to March 30, 2017, employees were exposed to electrical hazards due to the welding power cord and the other power cords directly connected to 30 Amp breakers in the 208Y/120V 3PH 4W electrical panel with its cover removed were not provided with strain relief.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at MC Construction Consulting INC.
View MC Construction Consulting INC.'s full OSHA safety record →
More inspections in this industry (NAICS 236220)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342210077.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.