Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: COX CONSTRUCTION CO.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of COX CONSTRUCTION CO. in P-1119 COM/ELEC MAINT FAC., OCEANSIDE, CA 92055 (NAICS 237990). OSHA activity number 342228582.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch COX Construction CO. — free Get an email when a new federal OSHA severe-injury report for COX Construction CO. is published. One employer, no account, unsubscribe in one click.
Site address
P-1119 COM/ELEC MAINT FAC.
City
OCEANSIDE
State
CA
ZIP
92055
Mailing
1210 DISTRIBUTION WAY, VISTA, CA 92081
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237990
Employees
27
Ownership type
A

3 citations on file for this inspection.

1926.28 A

Other-than-serious 1 instance 2 exposed
Issued
Aug 29, 2017
Penalty
Initial $2,182 · Current $2,182
29 CFR 1926.28(a): Appropriate personal protective equipment was not worn by employee(s) in all operations where there was exposure to hazardous conditions.    P-1119 Construction Project, 41 Area project site: Employees applied acrylic concrete curing and sealing compound with bare hands.  Employees were exposed to health hazards such as dermatitis.
Recent events (2)
  • — I (O) $2182
  • — Z (S) $2182

1926.701 B

Other-than-serious 6 instances 3 exposed
Issued
Aug 29, 2017
Penalty
Initial $2,182 · Current $2,182
29 CFR 1926.701(b): All protruding reinforcing steel, onto and/or into which employees could fall or come against, was not guarded to eliminate the hazard of impalement.    SOF Communication/Electrical Maintenance Facility Project site entrance: Employees worked next to unprotected rebar used to reinforce concrete formwork.  Employees were exposed to impalement hazards.
Recent events (2)
  • — I (O) $2182
  • — Z (S) $2182

1926.405 G02 IV

Other-than-serious 1 instance 2 exposed
Issued
Aug 29, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.405(g)(2)(iv): Flexible cords were not connected to devices and fittings so that strain relief is provided to prevent pull from being directly transmitted to joints or terminal screws.  Hallway of P1119 Construction Project site: Employees were working with a red and black striped flexible cord used to extend power to the wet vacuum cleaner which did not have strain relief. The insulation was pulled away from its outer sheathing.  Employees were exposed to minor shock hazards.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View COX Construction CO.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342228582.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.