OSHA Inspection: RICE MECHANICAL, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of RICE MECHANICAL, INC. in 231 S. LASALLE ST., CHICAGO, IL 60606 (NAICS 238220). OSHA activity number 342229838.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Rice Mechanical, INC. for free Get an email when a new federal OSHA severe-injury report for Rice Mechanical, INC. is published. One employer, no account, unsubscribe in one click.
Site address
231 S. LASALLE ST.
City
CHICAGO
State
IL
ZIP
60606
Mailing
809 ESTES AVE., SCHAUMBURG, IL 60195
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238220
Employees
25
Ownership type
A

5 citations on file for this inspection.

1926.451 B01

Serious Gravity 10 1 instance 2 exposed
Issued
May 30, 2017
Abate by
Jun 5, 2017
Penalty
Initial $5,070 · Current $2,535 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):      a)  On April 6, 2017, employees were exposed to the hazard of falling up to approximately 35 feet to the lower level while performing HVAC work from tubular welded frame scaffold platforms that were not fully planked.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • · I (S) $2535
  • · Z (S) $5070

1926.451 G01

Serious Gravity 10 1 instance 2 exposed
Issued
May 30, 2017
Abate by
Jun 5, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level:  a)  On April 6, 2017, employees were exposed to the hazard of falling up to approximately 35 feet to the lower level while performing HVAC work from a tubular welded frame scaffold platform.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.451 C02

Serious Gravity 5 1 instance 2 exposed
Issued
May 30, 2017
Abate by
Jun 5, 2017
Penalty
Initial $3,622 · Current $1,833 Reduced
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation:       a) On April 6, 2017, the scaffold structure that employees were working from did not bear on base plates.     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • · I (S) $1832.5
  • · Z (S) $3622

1926.451 C02 II

Serious Gravity 5 1 instance 2 exposed
Issued
May 30, 2017
Abate by
Jun 5, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.451(c)(2)(ii): Unstable objects were used to support scaffolds or platform units:  a) On April 6, 2017, employees were performing HVAC work from a tubular welded frame scaffolding that was supported by unstable objects.   In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.451 F03

Serious Gravity 5 1 instance 2 exposed
Issued
May 30, 2017
Abate by
Jun 5, 2017
Penalty
Initial $3,622 · Current $1,833 Reduced
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:    a)  On or about April 6, 2017, the employer did not ensure that the tubular welded frame scaffold was inspected by a competent person for visible defects before allowing employees to work from it.       In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • · I (S) $1832.5
  • · Z (S) $3622

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342229838.