OSHA Inspection: ALDERFER, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ALDERFER, INC. in 382 MAIN STREET, HARLEYSVILLE, PA 19438 (NAICS 311612). OSHA activity number 342249265.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ALDERFER, INC.
- Site address
- 382 MAIN STREET
- City
- HARLEYSVILLE
- State
- PA
- ZIP
- 19438
- Mailing
- 382 MAIN STREET, HARLEYSVILLE, PA 19438
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 311612
- Employees
- 50
- Ownership type
- A
Citations
4 citations on file for this inspection.
1910.147 C04 II B
- Issued
- Jun 9, 2017
- Abate by
- Jun 21, 2017
- Penalty
- Initial $5,387 · Current $3,771 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. a) Packing Room - on or about April 13, 2017, employees performed tasks to include cleaning and maintenance of door opener, Supervac 1, Crypvac Bagger, Supervac 2, and Extended Shrink Tunnel, but the energy control procedures developed by the employer did not include specific procedural steps for shutting down, isolating, blocking, or securing the equipment. b) Slicing Room - on or about April 13, 2017, employees performed tasks to include cleaning and maintenance of Trief Slicers and a Repak, but the energy control procedures developed by the employer did not include specific steps for shutting down, isolating, blocking, or securing the equipment. c) Stitching Room - on or about April 13, 2017, employees performed tasks to include cleaning and maintenance of Dumper, Injector, Mascerator, Mixer, Pump, and Portable Mixer, but the energy control procedures developed by the employer did not provide specific steps for shutting down, isolating, blocking, or securing the equipment. d) Raw Production - on or about April 13, 2017, employees performed tasks to include cleaning and maintenance of Large Tumbler, Mixer, Grinder, Bin Dumper 2, Small Tumbler, Bin Dumper 1, Tipper Tie Machines, VeMag, LP Stuffer, In Line Metal Detector, LP HVF-95, Bin Dumper 3, Auto Loader, Rapid Pak, and Shrink Tunnel, but the energy control procedures developed by the employer did not provide specific steps for shutting down, isolating, blocking, or securing the equipment.
Recent events (2)
- · I (S) $3770.9
- · Z (S) $5387
1910.147 C04 II D
- Issued
- Jun 9, 2017
- Abate by
- Jun 21, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(4)(ii)(D): The energy control procedures did not clearly and specifically outline the requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control. a) Packing Room - on or about April 13, 2017, employees performed tasks to include cleaning and maintenance of a Door Opener, Supervac 1, Supervac 2, and an Extended Shrink Tunnel, but the energy control procedures developed by the employer did not contain specific requirements for testing the machine or equipment to determine and verify the effectiveness of the lockout devices, tagout devices, and other energy control. b) Slicing Room - on or about April 13, 2017, employees performed tasks to include cleaning and maintenance of Trief Slicers and a Repak, but the energy control procedures developed by the employer did not contain specific requirements for testing the machine or equipment to determine and verify the effectiveness of the lockout devices, tagout devices, and other energy control. c) Stitching Room - on or about April 13, 2017, employees performed tasks to include cleaning and maintenance of a Dumper and a Mixer, but the energy control procedures developed by the employer did not contain specific requirements for testing the machine or equipment to determine and verify the effectiveness of the lockout devices, tagout devices, and other energy control. d) Raw Production - on or about April 13, 2017, employees performed tasks to include cleaning and maintenance of a Large Tumbler, Mixer, Grinder, Bin Dumper 2, Small Tumbler, Bin Dumper 1, Tipper Tie Machine, VeMag, LP Stuffer, LP HVF-95, Bin Dumper 3, Auto Loader, Rapid Pak, Shrink Tunnel, and Vacuum Pump, but the energy control procedures developed by the employer did not contain specific requirements for testing the machine or equipment to determine and verify the effectiveness of the lockout devices, tagout devices, and other energy control.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1910.147 C06 II
- Issued
- Jun 9, 2017
- Abate by
- Jun 28, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(6)(ii): The employer did not certify that periodic inspections of the energy control procedures had been performed: a) Throughout Facility - on or about April 13, 2017, employees performed cleaning and maintenance on machinery and equipment using lockout/tagout but the employer did not certify that periodic inspections of the energy control procedures had been performed.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1910.147 D04 I
- Issued
- Jun 9, 2017
- Abate by
- Jun 21, 2017
- Penalty
- Initial $5,387 · Current $3,771 Reduced
General-duty citation text
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices were not affixed to each energy isolating device by authorized employees: a) Raw Production - on or about April 13, 2017, lockout or tagout devices were not affixed to each energy isolating device by authorized employees on the Tipper Tie during maintenance activities to include installing vales into voiders.
Recent events (2)
- · I (S) $3770.9
- · Z (S) $5387
More inspections at Alderfer, INC.
View Alderfer, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 311612)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342249265.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.