OSHA Inspection: R & P CONSTRUCTION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of R & P CONSTRUCTION in 107A HALSEY STREET, BROOKLYN, NY 11216 (NAICS 238140). OSHA activity number 342285160.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch R & P Construction — free Get an email when a new federal OSHA severe-injury report for R & P Construction is published. One employer, no account, unsubscribe in one click.
Establishment
R & P CONSTRUCTION
Site address
107A HALSEY STREET
City
BROOKLYN
State
NY
ZIP
11216
Mailing
1037 HERKIMER STREET 2ND FLOOR, BROOKLYN, NY 11233
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
6
Ownership type
A

3 citations on file for this inspection.

1926.451 E01

Serious Gravity 10 1 instance 2 exposed
Issued
Sep 28, 2017
Abate by
Oct 11, 2017
Penalty
Initial $3,803 · Current $3,803
29 CFR 1926.451(e)(1): Where scaffold platforms were more than 2 feet above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers, stairway-type ladders, ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface was not used for access.  Site: Front of building at 107A Halsey Street, Brooklyn, NY 11216.  On or about 4/28/2017;  a) Employees worked on a 6 frames high, tubular welded frame scaffold and it did not have a safe means of access.  An employee climbed the cross braces and scaffold frames to access the scaffold.
Recent events (1)
  • — Z (S) $3803

1926.451 G04 I

Serious Gravity 10 1 instance 2 exposed
Issued
Sep 28, 2017
Abate by
Oct 11, 2017
Penalty
Initial $3,803 · Current $3,803
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews.  Site: Front of building at 107A Halsey Street, Brooklyn, NY 11216.  On or about 4/28/2017;  a) Employees working on the 4th level of a tubular welded frame scaffold.  No guardrails were installed along the two open ends and the open back side.
Recent events (1)
  • — Z (S) $3803

1926.501 B03

Serious Gravity 10 1 instance 2 exposed
Issued
Sep 28, 2017
Abate by
Oct 11, 2017
Penalty
Initial $3,803 · Current $3,803
29 CFR 1926.501(b)(3): Each employee in a hoist area was not protected from falling 6 feet (1.8m) or more to lower levels by guardrail systems or personal fall arrest systems:  Site: Front of building at 107A Halsey Street, Brooklyn, NY 11216.  On or about 4/28/2017;  a) An employee hoisting a bucket of cement from the ground floor to the platform on the 4th tier of the scaffold was exposed to a fall hazard of approximately 24 feet.  The employee was not provided with fall protection.
Recent events (1)
  • — Z (S) $3803

View R & P Construction's full OSHA safety record →