OSHA Inspection: BRYANT G. PARSONS & SON, INC. DBA PARSONS PIPE ORGAN BUILDERS

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of BRYANT G. PARSONS & SON, INC. DBA PARSONS PIPE ORGAN BUILDERS in 4820 STATE ROUTE 64, CANANDAIGUA, NY 14424 (NAICS 811490). OSHA activity number 342306875.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Bryant G. Parsons & SON, INC. DBA Parsons Pipe Organ Builders — free Get an email when a new federal OSHA severe-injury report for Bryant G. Parsons & SON, INC. DBA Parsons Pipe Organ Builders is published. One employer, no account, unsubscribe in one click.
Site address
4820 STATE ROUTE 64
City
CANANDAIGUA
State
NY
ZIP
14424
Mailing
4820 STATE ROUTE 64, CANANDAIGUA, NY 14424
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
811490
Employees
17
Ownership type
A

8 citations on file for this inspection.

1910.106 E06 I

Serious Gravity 1 1 instance 2 exposed
Issued
Jun 15, 2017
Penalty
Initial $1,570 · Current $1,570
29 CFR 1910.106(e)(6)(i): Adequate precautions against the ignition of flammable vapors were not taken:   a) Finishing Room, on or about 5/10/17: 5 gallon drum of flammable hazardous waste was not grounded, employees dump spray paint guns of waste into the 5 gallon drum.
Recent events (2)
  • — I (S) $1570
  • — Z (S) $1570

1910.106 E06 II

Serious Gravity 1 1 instance 2 exposed
Issued
Jun 15, 2017
Penalty
Initial $0 · Current $0
29 CFR 1910.106(e)(6)(ii): Class I flammable liquid(s) were dispensed into containers without electrically interconnecting the nozzle and the container:  a) Finishing Room, on or about 5/10/17: Employees dispense flammable materials from a spray gun to a secondary 5 gallon container with no means of electrically interconnecting the nozzle and the portable container.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.107 G02

Serious Gravity 1 1 instance 2 exposed
Issued
Jun 15, 2017
Penalty
Initial $1,570 · Current $0 Reduced
29 CFR 1910.107(g)(2): Spraying area(s) were not kept free from the accumulation of deposits of combustible residues:    a) Finishing Room, on or about 5/10/17: There was an accumulation of combustible residue on the spraying fixtures, employees spray with flammable lacquer thinner.
Recent events (2)
  • — I (S) $0
  • — Z (S) $1570

1910.134 E01

Serious Gravity 1 1 instance 2 exposed
Issued
Jun 15, 2017
Abate by
Jul 10, 2017
Penalty
Initial $1,847 · Current $1,201 Reduced
29 CFR 1910.134(e)(1): The employer did not provide a medical evaluation to determine the employees ability to use a respirator, before the employee was fit tested or required to use the respirator in the workplace:    Note:  The employer may discontinue an employees medical evaluations when the employee is no longer required to use a respirator      a) Finishing Room, on or about 5/10/17: Employees required to wear half face 3M air purifying respirators had not been provided with a medical evaluation.
Recent events (2)
  • — I (S) $1200.55
  • — Z (S) $1847

1910.134 F02

Serious Gravity 1 1 instance 2 exposed
Issued
Jun 15, 2017
Abate by
Jul 10, 2017
Penalty
Initial $0 · Current $0
29 CFR 1910.134(f)(2): Employer did not ensure that an employee using a tight fitting facepiece respirator was fit tested prior to initial use of the respirator, whenever a different respirator facepiece (size, style, model or make) was used, and at least annually thereafter:  a) Finishing Room, on or about 5/10/17: Employees required to wear half face air purifying respirators had not been fit tested.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.212 A01

Serious Gravity 5 1 instance 5 exposed
Issued
Jun 15, 2017
Penalty
Initial $2,093 · Current $1,360 Reduced
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created point of operation, rotating parts, and flying chips:       a)  Metal Shop, on or about 5/10/17: WMC Metal Cutting Band Saw was not protected with a guard on the unused portion of the blade on the left side and the right side.
Recent events (2)
  • — I (S) $1360.45
  • — Z (S) $2093

1910.213 H01

Serious Gravity 5 2 instances 3 exposed
Issued
Jun 15, 2017
Penalty
Initial $2,093 · Current $1,360 Reduced
29 CFR 1910.213(h)(1): The sides of the lower exposed portion of the blade of radial saw(s) were not guarded to the full diameter of the blade by a device that automatically adjusted itself to the thickness of the stock and remained in contact with the material being cut:    a) Wood Shop, on or about 5/10/17: Rockwell Radial Arm Saw had no lower blade guard on the right side of the blade.    b) Wood Shop, on or about 5/10/17: DeWalt Radial Arm Saw had no lower blade guard on the left side of the blade and the right side guard had an opening of 3" to the blade.
Recent events (2)
  • — I (S) $1360.45
  • — Z (S) $2093

1910.213 H01

Serious Gravity 5 3 instances 3 exposed
Issued
Jun 15, 2017
Penalty
Initial $0 · Current $0
29 CFR 1910.213(h)(4): Radial saw(s) were not installed in a manner so as to cause the cutting head to return gently to the starting position when released by the operator:  a)  Wood Shop, on or about 5/10/17:  Delta Radial Arm Saw did not return to the starting position when released.  b)  Wood Shop, on or about 5/10/17:  Rockwell Radial Arm Saw did not return to the starting position when released.  c)  Wood Shop, on or about 5/10/17:  DeWalt Radial Arm Saw did not return to the starting position when released.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Bryant G. Parsons & SON, INC. DBA Parsons Pipe Organ Builders's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342306875.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.