Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: BALFOUR BEATTY CONSTRUCTION, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of BALFOUR BEATTY CONSTRUCTION, LLC in 1430 INDUSTRIAL PARK BLVD, WASHINGTON, GA 30673 (NAICS 236220). OSHA activity number 342329836.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Balfour Beatty Construction, LLC — free Get an email when a new federal OSHA severe-injury report for Balfour Beatty Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
1430 INDUSTRIAL PARK BLVD
City
WASHINGTON
State
GA
ZIP
30673
Mailing
3100 MCKINNON STREET, DALLAS, TX 75201
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
4
Ownership type
A

1 citation on file for this inspection.

1926.20 B02

Deleted Serious Gravity 5 3 instances 16 exposed
Issued
Oct 20, 2017
Abate by
Nov 16, 2017
Penalty
Initial $6,157 · Current $0 Reduced
29 CFR 1926.20(b)(2): The employer did not initiate and maintain programs which provided for frequent and regular inspections of the job site, materials and equipment to be made by a competent person(s):   On or about May 15, 2017 at 1439 Industrial Park Blvd., Washington, Georgia where the controlling employer did not conduct frequent and regular inspections of the workplace to identify and remove electrical hazards including but not limited to:     a.         In Building #2, at temporary electrical panel D, a ground pin was broken off in one of the outlets exposing employees working in the area and using the electrical panel to an electrical shock or electrical burn hazard.       b.         In Building #2, at the temporary electrical panel D, the covers on the junction boxes and the receptacles were not flush or completely closed exposing employees working in the area and using the electrical panel to an electrical shock or electrical burn hazard.       c.         In Building #2, in the electrical room, the sheathing on the plug end of the vacuum cleaner used to clean up had pulled away from the connection, exposing the conductors beneath exposing employees to an electrical shock hazard.     d.         In Building #2, in the main hallway, the temporary electrical cords connected at the electrical panel D, were suspended six (6) feet above the finished floor across the hallway.  The cords provided power to various pieces of equipment, including but not limited to a cellular phone and a scissor lift.  Employees navigating the hallway were exposed to a caught by hazard.     In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $6157

View Balfour Beatty Construction, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342329836.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.